Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17191-17200 of 17350 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1000250 | Project ID: 1000250 DEA: 040Y3904 EFIS: 0422000274 | 04-ALA-262-R0.0/R1.1 | COLD PLANE AC PAVEMENT AND PLACE RHMA-G. | ALAMEDA COUNTY IN FREMONT FROM ROUTE 880 TO ROUTE 680 | 1 (06/03/2024) | Details CEM-3701 Report | |
1000251 | Project ID: 1000251 DEA: 042Y5004 | 04-NAP-221-0.2/1.7 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. | NAPA COUNTY IN AND NEAR NAPA FROM 0.2 MILE NORTH OF JUNCTION ROUTE 12/29 TO 0.2 MILE NORTH OF BASALT ROAD UNDERCROSSING | 1 (06/03/2024) | Details CEM-3701 Report | |
1000252 | Project ID: 1000252 DEA: 042Y5504 EFIS: 0423000127 | 04-SCL-101-40.2/48.6 | COLD PLANE AC PAVEMENT, PLACE HMA (TYPE A), AND REPLACE PCC SLABS. | SANTA CLARA COUNTY IN SAN JOSE AND MOUNTAIN VIEW FROM GUADALUPE RIVER BRIDGE TO NORTH SHORELINE BOULEVARD OVERCROSSING | 1 (04/15/2024) | Details CEM-3701 Report | |
1000255 | Project ID: 1000255 DEA: 081N7504 EFIS: 0823000045 | 08-SBD-138,189-21.4/R37.8,0.0/5.6 | SLURRY SEAL, TWO-COMPONENT PAINT TRAFFIC STRIPE, REPLACE AC SURFACING. | SAN BERNARDINO COUNTY ON ROUTE 138 FROM BOLINGBROKE ROAD TO ROUTE 18 AND ON ROUTE 189 FROM ROUTE 18 TO ROUTE 173 | 1 (05/15/2024) | Details CEM-3701 Report | |
1000256 | Project ID: 1000256 DEA: 120S2804 EFIS: 1220000014 | 12-ORA-5-9.6/10.4 | ADD SECONDARY AUXILIARY LANE. | ORANGE COUNTY IN SAN JUAN CAPISTRANO FROM ROUTE 74/5 SEPARATION TO 0.5 MILE SOUTH OF JUNIPERO SERRA ROAD UNDERCROSSING | 1 (05/14/2024) | Details CEM-3701 Report | |
1000257 | Project ID: 1000257 DEA: 120S7504 EFIS: 1221000034 | 12-ORA-1-R0.8 | MODIFY TRAFFIC SIGNAL, LIGHTING, CURB RAMPS, SIDEWALK AND PAVE HMA. | ORANGE COUNTY IN DANA POINT AT DOHENY PARK ROAD UNDERCROSSING | 1 (05/14/2024) | Details CEM-3701 Report | |
1000262 | Project ID: 1000262 DEA: 040Q8304 EFIS: 0418000160 | 04-NAP-29-46.1 | SOLDIER PILE, CONC BACKFILL, HMA, TIMBER LAGGING, AND MGS. | NAPA COUNTY NEAR CALISTOGA AT 2.5 MILES SOUTH OF LAKE COUNTY LINE | 1 (06/03/2024) | Details CEM-3701 Report | |
1000258 | Project ID: 1000258 DEA: 042K3604 EFIS: 0416000410 | 04-SON-116- | 1 (04/11/2024) | Details CEM-3701 Report | |||
1000261 | Project ID: 1000261 DEA: 010M6704 EFIS: 0123000054 | 01-DN-101-R27.9/31.2 | MICRO-SURFACING, PAVEMENT DELINEATION, AND REPLACE AC SURFACING. | DEL NORTE COUNTY NEAR CRESCENT CITY FROM WASHINGTON BOULEVARD OVERCROSSING TO ELK VALLEY CROSS ROAD | 1 (04/15/2024) | Details CEM-3701 Report | |
1000259 | Project ID: 1000259 DEA: 050N74V4 EFIS: 0522000043 | 05-SB-101-9.2/9.7 | FOR CONSTRUCTION ON STATE HIGHWAY IN SANTA BARBARA COUNTY AT MONTECITO FROM 0.2 MILE NORTH OF SHEFFIELD DRIVE UNDERCROSSING TO 0.3 MILE SOUTH OF SAN YSIDRO ROAD OVERCROSSING | 1 (04/15/2024) | Details CEM-3701 Report |