Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17051-17060 of 18754 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
4026Project ID: 4026
DEA: 07246704
07-LA-110- 22.0/ 23.2SURFACE IMPROVE TO MEDIAN/ISLAND 08/25/20101 (08/26/2010)Details CEM-3701 Report
5622Project ID: 5622
DEA: 100M3104
10-SJ-580-8.1/14.5Surfacing existing freeway with rubberized AC (Type G) 01/19/20111 (01/19/2011)Details CEM-3701 Report
1000520Project ID: 1000520
DEA: 040X0804
EFIS: 0424000028
04-SM-1-32.2SURFERS BEACH STAIRCASE  1 (08/19/2024)Details CEM-3701 Report
6509Project ID: 6509
DEA: 120E0804
Permit Numbers: 1207NMC0258
12-ORA-405-11.0/11.2SUSAN STREET OFFRAMP OVERHEAD SIGN 07/28/2010NOT VERIFIEDDetails CEM-3701 Report
7786Project ID: 7786
DEA: 031A43A4
EFIS: 0313000005
03-SUT-99-10.9/14.7Sutter 99 Feather River Bridge : Widen to provide four lane segmentSUTTER COUNTY NEAR NICOLAUS FROM POWER LINE ROAD TO 0.1 MILE SOUTH OF LAUREL AVENUE11/30/20171 (10/02/2012)Details CEM-3701 Report
212535Project ID: 212535
DEA: 031A9204
EFIS: 0300020608
03-SUT-20-5-11.3SUTTER BYPASS WIDENING AND REHABNEAR YUBA CITY FROM SUTTER BYPASS TO 0.1 MILE WEST OF LYTLE ROAD.12/01/20211 (07/23/2018)Details CEM-3701 Report
995512Project ID: 995512
DEA: 040W1004
EFIS: 0420000172
COOP: 042869
04-MRN-101-0.9/10.8SW Trash Capture MRN - FCO  NOT VERIFIEDDetails CEM-3701 Report
1001282Project ID: 1001282
DEA: 022J8604
EFIS: 0221000142
02-SHA-5-61.75/61.75Sweetbrier Deck Replacement - Bridge Rehabilitation and ReplacementIn Shasta County near Castella at Sweetbrier Overcrossing Bridge #06-0115 1 (05/27/2025)Details CEM-3701 Report
214134Project ID: 214134
Permit Numbers: 0519NCS0156 05196DP0549 0519NRT0813 0519NRT0814 0519NRT0812
05---25.267Sycamore Drive Pedestrian Improvements Project, which includes ADA curb ramps and sidewalk, new curb and gutter, slurry seal and a new crosswalk.Highway 246, Buellton10/29/20201 (09/30/2019)Details CEM-3701 Report
994287Project ID: 994287
DEA: 044G08A4
EFIS: 0421000306
COOP: 042891
04-SOL-I-80,I-505-SYSTEM INTEGRATION OF MANAGED LANESWESTBOUND AND EASTBOUND INTERSTATE 80 (I-80) FROM WEST OF RED TOP ROAD TO EAST OF INTERSTATE 505 (I-505) IN SOLANO COUNTY 2 (09/23/2022)Details CEM-3701 Report