Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17031-17040 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1755 | Project ID: 1755 EFIS: 0000001155 Permit Numbers: 04106DP1270 | 04-SON-116-27.4/27.8 | Removal and replacement of 8 feet of asphalt for transition to the new curb and gutter,(9)water service connections. | 961 Gravenstein Hwy , Sebastopol | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 1754 | Project ID: 1754 Permit Numbers: 04106DP1022 | 04-SON-116-27.4/27.8 | Removal and replacement of 8' of asphalt for transition to the new curb and gutter,(9)water service connections. | 961 Gravenstein Hwy , Sebastopol | 01/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 1753 | Project ID: 1753 Permit Numbers: 04106DP0835 | 04-SON-116-27.4/27.8 | Removal and replacement of 8' of asphalt for transition to the new curb and gutter,(9)water service connections. | 961 Gravenstein Hwy , Sebastopol | 11/30/00-1 | NOT VERIFIED | Details CEM-3701 Report |
| 1751 | Project ID: 1751 Permit Numbers: 04106DP0266 0409NMC0735 | 04-SOL-80-13.5 | WIDEN HIGHWAY, MODIFY EXISTING TRAFFIC SIGNAL | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 1750 | Project ID: 1750 Permit Numbers: 04106DP0094 | 04-CC-123-0/2.1 | Construct landscape improve including tree, shrub, and plant installation and/or replacement. | SAN PABLO AVE., EL CERRITO | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 1749 | Project ID: 1749 DEA: 040T2404 | 04-SOL-80-3.9/8.1 | REHABILITATE ROADWAY, RAMP, BARRIER AND SAFETY IMPROVEMENTS | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report | |
| 1748 | Project ID: 1748 DEA: 040T2114 EFIS: 0400000365 COOP: 1897A3 | 04-ALA-- | 03/18/2025 | 1 (05/25/2006) | Details CEM-3701 Report | ||
| 1747 | Project ID: 1747 DEA: 040T1644 | 04-SOL-80-12.8 | ROADWAY EXCAVATION AND CONCRETE | IN SOLANO COUNTY IN FAIRFIELD ATSOLANO COMMUNITY COLLEGE | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 1746 | Project ID: 1746 DEA: 040T14F4 | 04-SOL-37-8 | HIGHWAY PLANTING AND IRRIGATION | IN SOLANO COUNTY IN VALLEJO ATVARIOUS LOCATIONS | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 1745 | Project ID: 1745 DEA: 040T1454 EFIS: 0400000361 | 04-SOL-29,37-4.7/5.1,7.2/10.5 | Perform Highway Planting And Install Irrigation Systems. | SOLANO COUNTY IN VALLEJO AT ROUTE 37/29 SEPARATION AND ON ROUTE 37 FROM NAPA RIVER BRIDGE TO DIABLO STREET | 04/20/2014 | 1 (12/14/2009) | Details CEM-3701 Report |
