Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17021-17030 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994244 | Project ID: 994244 DEA: 051F6204 EFIS: 0514000039 | 05-SCR-152-1.9 | WIDEN BRIDGE, CONCRETE BARRIER, AND MODIFY ELECTRICAL SYSTEM. | SANTA CRUZ COUNTY NEAR WATSONVILLE AT CORRALITOS CREEK BRIDGE | 02/14/2024 | 1 (09/19/2022) | Details CEM-3701 Report |
| 2700 | Project ID: 2700 DEA: 050N2504 | 05-SCR-1-R0.5/R7.7 | Construct transportation management system. | SANTA CRUZ COUNTY NEAR WATSONVILLE AT VARIOUS LOCATIONSFROM 0.2 MILE SOUTH OF ROUTE 1/129 SEPARATION TO LARKIN VALLEY ROAD UNDERCROSSING | 06/14/2011 | 1 (04/25/2011) | Details CEM-3701 Report |
| 214976 | Project ID: 214976 DEA: 051G9904 EFIS: 0516000010 | 05-SCR-129-1.2/1.6 | CONSTRUCT ROUNDABOUT. | SANTA CRUZ COUNTY NEAR WATSONVILLE FROM 0.2 MILE EAST TO 0.2 MILE WEST OF LAKEVIEW ROAD | 09/08/2022 | 1 (09/03/2020) | Details CEM-3701 Report |
| 209344 | Project ID: 209344 DEA: 051A3804 EFIS: 0500020318 | 05-SCR-152-R2.0/8.3 | OVERLAY ROADWAY WITH RUBBERIZED HMA AND CONSTRUCT GUARDRAIL. | SANTA CRUZ COUNTY NEAR WATSONVILLE FROM HOLOHAN ROAD TO SANTA CLARA COUNTY LINE | 08/13/2018 | 1 (09/01/2014) | Details CEM-3701 Report |
| 211518 | Project ID: 211518 DEA: 051G4004 EFIS: 0515000009 | 05-SCR-152-3.7/8.3 | INSTALL PAVEMENT STRIPING AND MARKING, AND RUMBLE STRIP. | SANTA CRUZ COUNTY NEAR WATSONVILLE FROM THE CASSERLY/CARLTON ROAD TO THE SANTA CLARA COUNTY LINE | 08/22/2018 | 1 (10/26/2016) | Details CEM-3701 Report |
| 994486 | Project ID: 994486 DEA: 051Q0804 EFIS: 0522000148 | 05-SCR,SCR/SCR-9,1-17.41/17.5 | Repair of viaduct barrier wall and replace CIDH piles. Holiday Lane Viaduct Slipout. State Route 9 at PM SCR-09-8.4 Jay's Slide, and SR 236 (SCR-236-16.87) | Santa Cruz County. State Route 9 at PM SCR-09-8.4 and SR 236 (SCR-236-16.87) | 1 (02/13/2023) | Details CEM-3701 Report | |
| 213741 | Project ID: 213741 DEA: 07325704 EFIS: 0716000089 | 07-LA-5-1.7 | BUILDING CONSTRUCTION IN LOS ANGELES COUNTY IN SANTA FE SPRINGS AT 14044 FREEWAY DRIVE. | Santa Fe Springs, At 14044 Freeway Drive. | 1 (07/08/2019) | Details CEM-3701 Report | |
| 994959 | Project ID: 994959 DEA: 073257C4 EFIS: 0716000089 | 07-LA-5-1.7 | BUILDING CONSTRUCTION IN LOS ANGELES COUNTY IN SANTA FE SPRINGS AT 14044 FREEWAY DRIVE. | Santa Fe Springs, At 14044 Freeway Drive. | 09/24/2024 | 1 (07/11/2023) | Details CEM-3701 Report |
| 3635 | Project ID: 3635 EFIS: 0000001155 Permit Numbers: 0707NSN1206 | 07-LA-2-12.58 | Installing left turn phasing on all legs of the existing traffic signal system | Santa Monica Blvd. & Western Avenue, in the City of LA | 09/27/2010 | NOT VERIFIED | Details CEM-3701 Report |
| 7553 | Project ID: 7553 EFIS: 0000001155 Permit Numbers: 0712NSN0809 | 07-LA-2-2.871/2.871 | Install conduits, pull boxes and general traffic signal equipment Install 17-3-100 standards with 20 feet mast arms Install advanced detector loops Install actuation detector loops upgrade traffic signal indicators to 12 inches | Santa Monica Blvd., Los Angeles | 07/31/2018 | 1 (01/25/2013) | Details CEM-3701 Report |
