Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 17001-17010 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994394 | Project ID: 994394 DEA: 051M4504 EFIS: 0519000153 | 05-SCR-236-5.4 | RETAINING WALL, PAVEMENT, DRAINAGE & PERMANENT EROSION CONTROL. Heartwood Hill | SANTA CRUZ COUNTY NEAR BOULDER CREEK AT 1.1 MILES NORTH OF BOULDER CREEK BRIDGE | 02/14/2024 | 1 (11/10/2022) | Details CEM-3701 Report |
| 1001123 | Project ID: 1001123 DEA: 051H4704 EFIS: 0516000078 | 05-SCR-9-9-13.6,15.5 | REPLACE BRIDGES AND INSTALL MGS. | SANTA CRUZ COUNTY NEAR BOULDER CREEK AT SAN LORENZO RIVER BRIDGE AND AT KINGS CREEK BRIDGE | 1 (04/10/2025) | Details CEM-3701 Report | |
| 214074 | Project ID: 214074 DEA: 051K1404 EFIS: 0518000127 | 05-SCR-9-15.0, 15.00 | CONSTRUCT SOLDIER PILE RETAINING WALL, DRAINAGE AND EROSION CONTROL. | SANTA CRUZ COUNTY NEAR BOULDER CREEK AT SPRING CREEK ROAD | 02/03/2020 | 1 (04/25/2019) | Details CEM-3701 Report |
| 993237 | Project ID: 993237 DEA: 051K0604 EFIS: 0518000115 | 05-SCR-9-10.8 | EXTEND SIDE HILL VIADUCT. | SANTA CRUZ COUNTY NEAR BROOKDALE AT SIDEHILL VIADUCT BRIDGE | 03/28/2023 | 1 (10/06/2021) | Details CEM-3701 Report |
| 210542 | Project ID: 210542 DEA: 050T5404 EFIS: 0500000857 | 05-SCR-129-9.5/10.0 | REALIGN ROADWAY AND PLACE HMA OVER AGGREGATE BASE. | SANTA CRUZ COUNTY NEAR CHITTENDEN FROM 0.4 MILE WEST TO 0.1 MILE EAST OF CHITTENDEN UNDERPASS | 08/01/2018 | 1 (10/23/2015) | Details CEM-3701 Report |
| 210342 | Project ID: 210342 DEA: 051F3604 | 05-SCR-1-31.6,36.3 | INSTALL CATHODIC ANODES AND SCOUR MONITOR, AND REPAIR CONCRETE SPALL | SANTA CRUZ COUNTY NEAR DAVENPORT AT SCOTT CREEK BRIDGE AND AT WADDELL CREEK BRIDGE | 08/21/2018 | 1 (06/23/2015) | Details CEM-3701 Report |
| 215051 | Project ID: 215051 DEA: 050J2004 EFIS: 0512000069 | 05-SCR-1-31.9/35.7 | TRENCHLESS CONCRETE PIPE INSTALLATIONS AND INSTALL CONCRETE HEADWALLS. | SANTA CRUZ COUNTY NEAR DAVENPORT AT VARIOUS LOCATIONS FROM 0.3 MILE NORTH OF SCOTT CREEK TO 0.4 MILE NORTH OF SWANTON ROAD | 07/31/2024 | 1 (06/29/2020) | Details CEM-3701 Report |
| 993523 | Project ID: 993523 DEA: 051N6604 EFIS: 0521000075 | 05-SCR-35-3.5/7.7 | COLD PLANE EXISTING ROADWAY AND PLACE RHMA-G OVERLAY. | SANTA CRUZ COUNTY NEAR LEXINGTON HILLS FROM BEAR CREEK ROAD TO SANTA CLARA COUNTY LINE | 10/20/2022 | 1 (02/16/2022) | Details CEM-3701 Report |
| 2770 | Project ID: 2770 DEA: 050P6504 | 05-SCR-9-1.8 | Construct retaining wall | SANTA CRUZ COUNTY NEAR SANTA CRUZ 0.2 MILE SOUTH OF RINCON CREEK BRIDGE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 209910 | Project ID: 209910 DEA: 051C8604 EFIS: 0513000004 | 05-SCR-1-20.2/37.4 | OVERLAY WITH RHMA-G. | SANTA CRUZ COUNTY NEAR SANTA CRUZ FROM 0.1 MILE NORTH OF WESTERN DRIVE TO SAN MATEO COUNTY LINE | 08/13/2018 | 1 (01/07/2015) | Details CEM-3701 Report |
