Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 17001-17010 of 17992 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
209257Project ID: 209257
DEA: 031E4101
EFIS: 0300000261
Permit Numbers: 0312NMC0802
03-SAC-99-12.34/12.91Construct hook on-ramp to NB 99 and extend off-rampSR99/Elk Grove Blvd, Elk Grove04/27/20182 (01/09/2014)Details CEM-3701 Report
5563Project ID: 5563
DEA: 100G2004
10-STA-4-R1.7CONSTRUCT ROCK SLOPE PROTECTIONSTA county04/17/20111 (12/07/2009)Details CEM-3701 Report
209953Project ID: 209953
DEA: 100X3204
EFIS: 1012000212
10-STA,MER-108,165-33.1/36.1,30.0/32.4,COLD PLANE AC PAVEMENT AND CONSTRUCT RUMBLE STRIPS.STANISLAUS AND MERCED COUNTIES ON ROUTE 108 FROM EIGHTH STREET TO CRANE ROAD AND ON ROUTE 165 FROM WESTSIDE BOULEVARD TO WILLIAMS AVENUE02/23/20161 (10/28/2014)Details CEM-3701 Report
212861Project ID: 212861
DEA: 101H2804
EFIS: 1017000190
10-STA-5-10.7/25.5BRIDGE DECK OVERLAY WITH POLYESTER CONCRETE, REPLACE APPROACH SLABS & JOINT SEALS IN STANISLAUS COUNTY ON STATE ROUTE 5 FROM FINK ROAD UC TO KHALSA ROAD UC.STANISLAUS AND MERCED COUNTIES. 1 (03/23/2020)Details CEM-3701 Report
214525Project ID: 214525
DEA: 100W6304
EFIS: 1012000021
10-STA,SJ-5-27.0/27.4,0.9REPLACE WASTEWATER SYSTEM.STANISLAUS AND SAN JOAQUIN COUNTIES ABOUT 9 MILES NORTHWEST OF PATTERSON AT THE WESTLEY SAFETY ROADSIDE REST AREA AND ABOUT 0.9 MILE NORTH OF THE COUNTY LINE08/23/20231 (11/19/2019)Details CEM-3701 Report
211278Project ID: 211278
DEA: 101E0004
EFIS: 1015000060
10-STA,SJ-33-18.0/27.1,0.0/5.0RUBBERIZED HOT MIX ASPHALT RESURFACING.STANISLAUS AND SAN JOAQUIN COUNTIES AT AND NEAR WESTLEY FROM ROGERS ROAD TO LEHMAN ROAD11/14/20161 (06/23/2016)Details CEM-3701 Report
212697Project ID: 212697
DEA: 101C3004
EFIS: 1014000145
10-STA,SJ-99-R20.9/R24.7, 0.0/6.8RAMP WIDENING, DRAINAGE, RAMP METERS, AND FIBER OPTIC SYSTEM.STANISLAUS AND SAN JOAQUIN COUNTIES FROM 0.8 MILE SOUTH OF PELANDALE AVENUE OVERCROSSING IN MODESTO TO 0.2 MILE NORTH OF THE NORTH JUNCTION ROUTE 120/99 SEPARATION IN MANTECA01/04/20211 (01/25/2018)Details CEM-3701 Report
5812Project ID: 5812
DEA: 100U0004
10-STA,SJ-99,132-M18.3/M18.7,5.8/7.1Repair failed areas on ramps and fog seal shoulders.STANISLAUS AND SAN JOAQUIN COUNTIES ON ROUTE 99 FROM 0.2 MILE SOUTH OF CARPENTER/ BRIGGSMORE AVENUE OVERCROSSINGTO 0.2 MILE NORTH OF CARPENTER/ BRIGGSMORE AVENUE OVERCROSSING AND ON ROUTE 132FROM ROUTE 132/33 SEPARATION AND OVERHEAD TO STANISLAUS COUN04/08/20111 (06/03/2010)Details CEM-3701 Report
994300Project ID: 994300
DEA: 101C4004
EFIS: 1017000025
10-STA,TUO-49,108,120-VarREMOVE EXISTING GUARDRAIL AND INSTALL MIDWEST GUARDRAIL SYSTEM.STANISLAUS AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS02/26/20241 (10/04/2022)Details CEM-3701 Report
210158Project ID: 210158
DEA: 100G4204
EFIS: 1014000038
COOP: 10437
10-STA-5-15.8/15.9Reconstruct the existing Interstate 5/Sperry Road InterchangeStanislaus County 2 (01/30/2015)Details CEM-3701 Report