Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16901-16910 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211174 | Project ID: 211174 DEA: 010G0304 | 01-DN-101-21.23, 21.23 | Stabilize Roadway | In Del Norte County near Crescent City at 0.22 miles north of Cushing Creek Viaduct 01-0076 | 12/21/2020 | 1 (01/03/2017) | Details CEM-3701 Report |
| 21 | Project ID: 21 DEA: 010A8704 EFIS: 0100020413 | 01-MEN-101-4.8/5.3 | Stabilize roadway and Dewater | Squaw Rock Sidehill Viaduct | 04/09/2013 | 1 (03/31/2011) | Details CEM-3701 Report |
| 2755 | Project ID: 2755 DEA: 050P3504 | 05-SLO-1-73.8 | Stabilize Roadway And Drainage Structures. | In San Luis Obispo County near Ragged Point 2.4 miles North of San Carpoforo Creek Bridge | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2937 | Project ID: 2937 DEA: 051A2704 EFIS: 0500020329 | 05-MON-1-59.7/59.9 | Stabilize roadway and install temporary traffic signal | .1 mile north of Rocky Creek Bridge | 06/21/2013 | 1 (03/23/2011) | Details CEM-3701 Report |
| 7242 | Project ID: 7242 DEA: 01474414 EFIS: 0112000162 | 01-HUM-299-8.4/8.6 | STABILIZE ROADWAY, REALIGN ROADWAY, IMPROVE DRAINAGE, REPLACE CULVERTS | NEAR BLUE LAKE , AT 1.8 MILE EAST OF BUCKLEY RD. AND 0.1 MILE EAST OF THREE CREEKS RD | 12/19/2014 | 1 (06/11/2012) | Details CEM-3701 Report |
| 212221 | Project ID: 212221 DEA: 033H1104 EFIS: 0317000231 | 03-ED-50-37.6, 37.60 | Stabilize slipout and re-esstablish both directions of travel | In El Dorado County on Rte 50 approximately .4 miles east of Bridal Veil Falls Road | 08/06/2019 | 1 (03/17/2017) | Details CEM-3701 Report |
| 6369 | Project ID: 6369 DEA: 11382604 EFIS: 1100020188 MINOR: 11A1909 | 11-SD-78-32.6 | STABILIZE SLOPE | IN SAN DIEGO COUNTY near Ramona | 1 (11/01/2010) | Details CEM-3701 Report | |
| 210170 | Project ID: 210170 DEA: 010F0104 EFIS: 0115000056 | 01-HUM-299-24.1, 24.2 | Stabilize slope and reconstruct roadway | In Hum County | 08/27/2018 | 2 (01/30/2015) | Details CEM-3701 Report |
| 6384 | Project ID: 6384 DEA: 11406304 EFIS: 1100020300 | 11-SD-52-14.8 | Stabilize slope and replace concrete slab | In SD County , in Santee, at the Connector from Eastbound SR 52 to SB 125 | 1 (05/07/2012) | Details CEM-3701 Report | |
| 210759 | Project ID: 210759 DEA: 120N1104 EFIS: 1213000116 | 12-ORA-101,154-9.5 | STABILIZE SLOPE EMBANKMENT AND ROADWAY AT ROUTE 133/5 SEPARATION. | IN ORANGE COUNTY IN IRVINE AT ROUTE133 / 5 SEPARATION. | 06/25/2019 | 1 (06/20/2016) | Details CEM-3701 Report |
