Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16901-16910 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213232 | Project ID: 213232 DEA: 043K6504 EFIS: 0417000190 | 04-SCL-85-0.0 - 5.6 | COLD PLANE AC PAVEMENT AND PLACE RHMA-OPEN GRADED. | SANTA CLARA COUNTY IN SAN JOSE FROM ROUTE 85/101 SEPARATION TO GUADALUPE RIVER BRIDGE | 01/08/2020 | 1 (06/12/2018) | Details CEM-3701 Report |
| 2155 | Project ID: 2155 DEA: 042E0804 | 04-SCL-85-0.0/5.60 | COLD PLANE AC PAVEMENT AND PLACE RHMA (GAP GRADED) SURFACING. | SANTA CLARA COUNTY IN SAN JOSE FROM ROUTE 85/101 SEPERATION TO GUADALUPE RIVER BRIDGE | 08/31/2012 | 1 (08/31/2012) | Details CEM-3701 Report |
| 994684 | Project ID: 994684 DEA: 040Y1704 EFIS: 0422000248 | 04-SCL-280-R2.5/L5.9 | INDIVIDUAL SLAB REPLACEMENT (RSC). | SANTA CLARA COUNTY IN SAN JOSE FROM ROUTE 87 SEPARATION TO 0.1 MILE EAST OF WINCHESTER BOULEVARD OVERCROSSING | 08/13/2024 | 1 (05/09/2023) | Details CEM-3701 Report |
| 214768 | Project ID: 214768 DEA: 043Q4404 EFIS: 0419000212 | 04-SCL-87-7.5/9.2 | COLD PLANE AC PAVEMENT AND OVERLAY WITH RHMA-G. | SANTA CLARA COUNTY IN SAN JOSE FROM ROUTE 87/880 SEPARATION TO ROUTE N87-N101/ 101 CONNECTOR SEPARATION | 12/31/2020 | 1 (09/17/2020) | Details CEM-3701 Report |
| 212261 | Project ID: 212261 DEA: 041K0404 EFIS: 0416000182 | 04-SCL-87-6.1/7.5 | HM1 - COLD PLANE AND OVERLAY WITH RUBBERIZED HOT MIX ASPHALT. | SANTA CLARA COUNTY IN SAN JOSE FROM WEST JULIAN STREET UNDERCROSSING TO ROUTE 87/880 SEPARATION | 08/08/2018 | 1 (04/20/2017) | Details CEM-3701 Report |
| 212062 | Project ID: 212062 DEA: 040K9504 EFIS: 0416000173 | 04-SCL-17-2.8/7.5 | HM1 - REPLACE ASPHALT CONCRETE SURFACING. | SANTA CLARA COUNTY IN SANTA CLARA AND LOS GATOS FROM 0.1 MILE NORTH OF HEBARD WAY TO 0.16 MILE SOUTH OF BLOSSOM HILL ROAD | 08/22/2018 | 1 (04/20/2017) | Details CEM-3701 Report |
| 7252 | Project ID: 7252 DEA: 042E0704 | 04-SCL-82-14.3/19.2 | COLD PLANE AND PLACE HOT MIX ASPHALT (OPEN GRADED). | SANTA CLARA COUNTY IN SANTA CLARA, SUNNYVALE AND MOUNTAIN VIEW FROM LAWRENCE EXPRESSWAY TO 0.4 MILE WEST OF ROUTE 82/85 SEPARATION | 08/16/2013 | 1 (04/30/2012) | Details CEM-3701 Report |
| 213278 | Project ID: 213278 DEA: 040Q9404 EFIS: 0418000180 | 04-SCL-85-R11.5/R17.2 | UPGRADE FROM THE STANDARD 4-INCH-WIDE STRIPES TO 6-INCH-WIDE STRIPES. | SANTA CLARA COUNTY IN SARATOGA AND CUPERTINO FROM 0.5 MILE NORTH OF WINCHESTER BOULEVARD OVERCROSSING TO 0.5 MILE SOUTH OF STEVEN CREEK BOULEVARD OVERCROSSING | 10/21/2019 | 1 (08/28/2019) | Details CEM-3701 Report |
| 993803 | Project ID: 993803 DEA: 042K2804 EFIS: 0416000400 | 04-SCL-9-5.9 | ROCK SLOPE PROTECTION, DRAINAGE, CLEARING AND GRUBBING | SANTA CLARA COUNTY IN SARATOGA AT 0.3 MILE NORTH OF PIERCE ROAD | 05/01/2023 | 1 (05/11/2022) | Details CEM-3701 Report |
| 215726 | Project ID: 215726 DEA: 043Q3804 EFIS: 0419000206 | 04-SCL-9-3.6/6.9 | COLD PLANE AC PAVEMENT AND OVERLAY WITH RHMA. | SANTA CLARA COUNTY IN SARATOGA FROM WEST BRANCH SARATOGA CREEK BRIDGE TO SPRINGER AVENUE | 06/22/2022 | 1 (04/29/2021) | Details CEM-3701 Report |
