Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16761-16770 of 17992 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994528 | Project ID: 994528 DEA: 040Y3804 EFIS: 0422000273 | 04-SON-116-32.5/35.0 | COLD PLANE AC PAVEMENT AND PLACE HOT MIX ASPHALT. | SONOMA COUNTY IN AND NEAR COTATI FROM 0.2 MILE EAST OF GILCHRIST ROAD TO NORTH JUNCTION ROUTE 101 | 02/16/2024 | 1 (03/23/2023) | Details CEM-3701 Report |
211735 | Project ID: 211735 DEA: 04264H64 EFIS: 0414000224 | 04-SON-12,101-R15.5/R16.0,2.0/22.4 | REPLACEMENT HIGHWAY PLANTING | SONOMA COUNTY IN AND NEAR PETALUMA AND SANTA ROSA ON ROUTE 12 AND ON ROUTE 101 AT VARIOUS LOCATIONS | 03/12/2021 | 1 (08/19/2019) | Details CEM-3701 Report |
1597 | Project ID: 1597 DEA: 040A1844 EFIS: 0400020004 COOP: 042337 | 04-SON-101-7.1/8.9 | WIDEN ROADWAY AND BRIDGE. | SONOMA COUNTY IN AND NEAR PETALUMA FROM 0.5 MILE SOUTH OF OLD REDWOOD HIGHWAY OVERCROSSING TO 0.1 MILE NORTH OF PEPPER ROAD | 10/14/2013 | 1 (06/28/2011) | Details CEM-3701 Report |
994837 | Project ID: 994837 DEA: 042W0404 EFIS: 0421000130 | 04-SON-116-36.4/39.3 | REPLACE ASPHALT CONCRETE SURFACING AND STRIPPING. | SONOMA COUNTY IN AND NEAR PETALUMA FROM FRATE ROAD TO STAGE GULCH CREEK BRIDGE | 08/19/2024 | 1 (08/28/2023) | Details CEM-3701 Report |
7463 | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 | 04-SON-101-0.9/3.6 | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD | 06/03/2020 | 1 (09/11/2012) | Details CEM-3701 Report |
213281 | Project ID: 213281 DEA: 043K6104 EFIS: 0417000186 | 04-SON-116-25.0/27.9 | COLD PLANE AC PAVEMENT AND PLACE HMA (A). | SONOMA COUNTY IN AND NEAR SEBASTOPOL FROM MILL STATION ROAD TO 0.1 MILE EAST OF COOPER ROAD | 10/31/2019 | 1 (06/18/2018) | Details CEM-3701 Report |
209154 | Project ID: 209154 DEA: 043E2104 EFIS: 0412000284 | 04-SON-101-29.3/R38.7 | REPLACE EXISTING CONCRETE PAVEMENT. | SONOMA COUNTY IN AND NEAR WINDSOR AND HEALDSBURG FROM WINDSOR LANE UNDERCROSSING TO 0.2 MILE NORTH OF LYTTON SPRINGS ROAD UNDERCROSSING | 10/21/2014 | NOT VERIFIED | Details CEM-3701 Report |
211875 | Project ID: 211875 DEA: 040J6404 EFIS: 0414000021 | 04-SON-101-29.3/R43.4 | RESURFACE AND RESTORE PAVEMENT FOR MAINLINE AND RAMPS | SONOMA COUNTY IN AND NEAR WINDSOR AND HEALDSBURG FROM WINDSOR LANE UNDERCROSSING TO ROUTE 101/128 SEPARATION | 06/21/2019 | 1 (04/18/2017) | Details CEM-3701 Report |
1909 | Project ID: 1909 DEA: 041E2804 | 04-SON-101-29.4/R50.1 | REPLACE CRACKED CONCRETE SLABS WITH RAPID STRENGTH CONCRETE (RSC). | SONOMA COUNTY IN AND NEAR WINDSOR, HEALDSBURG AND CLOVERDALE FROM 0.1 MILE SOUTH OF WINDSOR CREEK BRIDGE TO 0.3 MILE SOUTH OF SOUTH CLOVERDALE OVERCROSSING | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
2447 | Project ID: 2447 DEA: 044S6504 EFIS: 0400001255 | 04-SON-101-R52.1/R52.5 | CONSTRUCT SOLDIER PILE WALL, TIEBACK WALL AND REINFORCED CIDH PILES. | SONOMA COUNTY IN CLOVERDALE FROM FIRST STREET UNDERCROSSING TO 1.7 MILES SOUTH OF 101/128 SEPARATION | 06/13/2013 | 1 (02/27/2012) | Details CEM-3701 Report |