Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16761-16770 of 17992 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
994528Project ID: 994528
DEA: 040Y3804
EFIS: 0422000273
04-SON-116-32.5/35.0COLD PLANE AC PAVEMENT AND PLACE HOT MIX ASPHALT.SONOMA COUNTY IN AND NEAR COTATI FROM 0.2 MILE EAST OF GILCHRIST ROAD TO NORTH JUNCTION ROUTE 10102/16/20241 (03/23/2023)Details CEM-3701 Report
211735Project ID: 211735
DEA: 04264H64
EFIS: 0414000224
04-SON-12,101-R15.5/R16.0,2.0/22.4REPLACEMENT HIGHWAY PLANTINGSONOMA COUNTY IN AND NEAR PETALUMA AND SANTA ROSA ON ROUTE 12 AND ON ROUTE 101 AT VARIOUS LOCATIONS03/12/20211 (08/19/2019)Details CEM-3701 Report
1597Project ID: 1597
DEA: 040A1844
EFIS: 0400020004
COOP: 042337
04-SON-101-7.1/8.9WIDEN ROADWAY AND BRIDGE.SONOMA COUNTY IN AND NEAR PETALUMA FROM 0.5 MILE SOUTH OF OLD REDWOOD HIGHWAY OVERCROSSING TO 0.1 MILE NORTH OF PEPPER ROAD10/14/20131 (06/28/2011)Details CEM-3701 Report
994837Project ID: 994837
DEA: 042W0404
EFIS: 0421000130
04-SON-116-36.4/39.3REPLACE ASPHALT CONCRETE SURFACING AND STRIPPING.SONOMA COUNTY IN AND NEAR PETALUMA FROM FRATE ROAD TO STAGE GULCH CREEK BRIDGE08/19/20241 (08/28/2023)Details CEM-3701 Report
7463Project ID: 7463
DEA: 042640U4
EFIS: 0412000195
04-SON-101-0.9/3.6CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BRSONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD06/03/20201 (09/11/2012)Details CEM-3701 Report
213281Project ID: 213281
DEA: 043K6104
EFIS: 0417000186
04-SON-116-25.0/27.9COLD PLANE AC PAVEMENT AND PLACE HMA (A).SONOMA COUNTY IN AND NEAR SEBASTOPOL FROM MILL STATION ROAD TO 0.1 MILE EAST OF COOPER ROAD10/31/20191 (06/18/2018)Details CEM-3701 Report
209154Project ID: 209154
DEA: 043E2104
EFIS: 0412000284
04-SON-101-29.3/R38.7REPLACE EXISTING CONCRETE PAVEMENT.SONOMA COUNTY IN AND NEAR WINDSOR AND HEALDSBURG FROM WINDSOR LANE UNDERCROSSING TO 0.2 MILE NORTH OF LYTTON SPRINGS ROAD UNDERCROSSING10/21/2014NOT VERIFIEDDetails CEM-3701 Report
211875Project ID: 211875
DEA: 040J6404
EFIS: 0414000021
04-SON-101-29.3/R43.4RESURFACE AND RESTORE PAVEMENT FOR MAINLINE AND RAMPSSONOMA COUNTY IN AND NEAR WINDSOR AND HEALDSBURG FROM WINDSOR LANE UNDERCROSSING TO ROUTE 101/128 SEPARATION06/21/20191 (04/18/2017)Details CEM-3701 Report
1909Project ID: 1909
DEA: 041E2804
04-SON-101-29.4/R50.1REPLACE CRACKED CONCRETE SLABS WITH RAPID STRENGTH CONCRETE (RSC).SONOMA COUNTY IN AND NEAR WINDSOR, HEALDSBURG AND CLOVERDALE FROM 0.1 MILE SOUTH OF WINDSOR CREEK BRIDGE TO 0.3 MILE SOUTH OF SOUTH CLOVERDALE OVERCROSSING07/29/20111 (07/29/2011)Details CEM-3701 Report
2447Project ID: 2447
DEA: 044S6504
EFIS: 0400001255
04-SON-101-R52.1/R52.5CONSTRUCT SOLDIER PILE WALL, TIEBACK WALL AND REINFORCED CIDH PILES.SONOMA COUNTY IN CLOVERDALE FROM FIRST STREET UNDERCROSSING TO 1.7 MILES SOUTH OF 101/128 SEPARATION06/13/20131 (02/27/2012)Details CEM-3701 Report