Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16741-16750 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7101 | Project ID: 7101 DEA: 050T3304 EFIS: 0500000839 | 05-SB-135-R9.1/11.7 | COLD PLANE EXISTING ASPHALT CONCRETE PAVEMENT AND PLACE RHMA | SANTA BARBARA COUNTY IN AND NEAR SANTA MARIA FROM NORTH ROUTE 135/1 SEPARATION TO LAKEVIEW ROAD | 10/02/2012 | 1 (06/22/2012) | Details CEM-3701 Report |
| 209325 | Project ID: 209325 DEA: 051A3504 EFIS: 0500020315 | 05-SB-246-29.9/31.4 | REPAVE EXISTING PAVEMENT WITH HOT MIX ASPHALT (TYPE A). | SANTA BARBARA COUNTY IN AND NEAR SOLVANG FROM PINE STREET TO 0.2 MILE WEST OF QUAIL VALLEY ROAD | 08/13/2018 | 1 (04/16/2014) | Details CEM-3701 Report |
| 211235 | Project ID: 211235 DEA: 054482U4 EFIS: 0500000543 | 05-SB-101-2.2/3.3 | BUILD AND RECONSTRUCT BRIDGES, CONSTRUCT RAMPS AND FRONTAGE ROAD. | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE | 08/23/2021 | 1 (07/27/2016) | Details CEM-3701 Report |
| 214254 | Project ID: 214254 DEA: 05448214 EFIS: 0516000043 | 05-SB-101-2.2/3.3 | INVASIVE PLANT MANAGEMENT, INSTALL IRRIGATION AND PLANTING. | SANTA BARBARA COUNTY IN CARPINTERIA FROM 0.2 MILE SOUTH OF CARPINTERIA CREEK BRIDGE TO FRANKLIN CREEK BRIDGE | 06/26/2023 | 1 (09/06/2019) | Details CEM-3701 Report |
| 212986 | Project ID: 212986 DEA: 050G0714 EFIS: 0513000101 | 05-SB-101-22.3/23.0 | REPLACEMENT PLANTING AND PLANT ESTABLISHMENT. | SANTA BARBARA COUNTY IN GOLETA FROM 0.2 MILE EAST OF FAIRVIEW AVENUE OVERCROSSING TO 0.2 MILE WEST OF SAN PEDRO CREEK BRIDGE | 05/24/2022 | 1 (06/12/2018) | Details CEM-3701 Report |
| 209065 | Project ID: 209065 DEA: 050G0704 EFIS: 0500000055 | 05-SB-101-22.3/23.0 | UPGRADE DRAINAGE CULVERTS | SANTA BARBARA COUNTY IN GOLETA FROM 0.2 MILE EAST TO 0.7 MILE WEST OF FAIRVIEW AVENUE OVERCROSSING | 02/01/2018 | 1 (03/03/2014) | Details CEM-3701 Report |
| 2659 | Project ID: 2659 DEA: 050M14V4 EFIS: 0500000804 | 05-SB-101-26.5/27.1 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | SANTA BARBARA COUNTY IN GOLETA FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF CATHEDRAL OAKS ROAD OVERCROSSING | 08/13/2018 | 1 (09/26/2011) | Details CEM-3701 Report |
| 994245 | Project ID: 994245 DEA: 051H4304 EFIS: 0516000073 | 05-SB-101-21.4/21.9 | San Jose Creek Bridge replacement | SANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE | 1 (09/19/2022) | Details CEM-3701 Report | |
| 6882 | Project ID: 6882 DEA: 050T9104 | 05-SB-1-22.5 | CLEAN AND PAINT EXISTING STEEL BRIDGE | SANTA BARBARA COUNTY IN LOMPOC AT THE SANTA YNEZ RIVER BRIDGE | 11/28/2012 | 1 (11/28/2012) | Details CEM-3701 Report |
| 993718 | Project ID: 993718 DEA: 051H0104 EFIS: 0516000012 | 05-SB-1,246-19.3/20.6,8.3/9.5 | PLACE HMA, CURB RAMPS AND MODIFY SIGNAL AND LIGHTING SYSTEMS. | SANTA BARBARA COUNTY IN LOMPOC ON ROUTE 246 FROM 0.3 MILE WEST OF V STREET TO WEST JUNCTION ROUTE 1/246 AND ON ROUTE 1 FROM WEST JUNCTION ROUTE 1/246 TO EAST JUNCTION ROUTE 1/246 | 01/11/2024 | 1 (04/19/2022) | Details CEM-3701 Report |
