Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16571-16580 of 17398 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
6930Project ID: 6930
EFIS: 0000001155
Permit Numbers: 0511NRT0476
05-MON-68-13.1/13.6Construct Dual Left Turn Lanes on WB Highway 68 under Cooperative Agreement # 05-0201, E.A. # 05-0H8221State Route 68, Salinas09/18/2018NOT VERIFIEDDetails CEM-3701 Report
213821Project ID: 213821
Permit Numbers: 03186TN1303
03--70-1.2/1.2AsBuilts Install approximately 330 feet of 48" drain pipe and 60" steel casing east to west from the River Oaks Detention Basin, under SR 70, and terminating in the Algodon Slough/Canal.State Route 70, Plumas Lake 1 (10/05/2020)Details CEM-3701 Report
4762Project ID: 4762
EFIS: 0000001155
Permit Numbers: 0808NMC1221
08-RIV-74-28.767/29.287Enter onto State Route 74 right of way at Antelope Road and Palomar Road, in the City of Menifee, for Phase III highway improvement project to widen the highway including the construction of new AC pavement, AC overlay, storm drain, traffic signal, sidewalkState Route 74 , Menifee06/08/2012NOT VERIFIEDDetails CEM-3701 Report
213673Project ID: 213673
Permit Numbers: 11186UJ0656
11--76-12.01/12.01enter upon State Highway right of way in San Diego County, Community of Bonsall, on Route 76, post mile 12.01, to install 4-inch PE gas pipe line within 6-inch Steel Casing by Horizontal Directional Drilling (HDD) method, as shown on the attached plans, in accordance with the requirements and condiState Route 76, Bonsall08/18/20211 (08/18/2021)Details CEM-3701 Report
213818Project ID: 213818
Permit Numbers: 11186MC0444 11196RT0258
11---4.53/-1enter upon State Highway right of way in San Diego County, City of Oceanside on Route 76, post mile R4.53, to install new traffic signals at the intersection of Mission Gate Drive and Mission Avenue, as shown on the attached plans, in accordance with the requirements and conditions contained hereinState Route 76, Oceanside08/24/20211 (06/14/2019)Details CEM-3701 Report
4760Project ID: 4760
Permit Numbers: 0808NMC0594 0809NRT0367 08096DP05163
08-RIV-79-29.88/29.88Enter onto State Route 79 (Ramona Expressway) right-of-way at Sanderson Avenue intersection, in City of San Jacinto, to provide street improvements by adding an additional left-turn lane and through-lane on all four approaches of the intersection, AC overState Route 79 (Ramona Expressway), San Jacinto07/03/2009NOT VERIFIEDDetails CEM-3701 Report
4791Project ID: 4791
EFIS: 0000001155
Permit Numbers: 0809NMC0225
08-RIV-79-7.6/8Enter onto State Route 79 (Winchester Road) right-of-way at Clinton Keith Road/Benton Road, in the City of Murrieta, to widen the southbound State highway and to add the fourth leg of the street intersection (Clinton Keith Road) which include but not limitState Route 79 (Winchester Road), Murrieta08/30/20122 (08/30/2012)Details CEM-3701 Report
5195Project ID: 5195
DEA: 080K4004
EFIS: 0800000345
Permit Numbers: 0811NMC0640 0811NMC0640
08-RIV-79-7.63/8.44Enter onto State Route 79 (Winchester Road) at and near Thompson Road, in the City of Murrieta, to widen the State highway including but not limited to the construction of a new AC pavement, curb & gutter, sidewalk, handicapped ramps, storm drain pipes, landscape, street lights, and traffic sigState Route 79 (Winchester Road), Murrieta07/31/2018NOT VERIFIEDDetails CEM-3701 Report
5196Project ID: 5196
DEA: 08464614
EFIS: 0800001041
Permit Numbers: 0811NMC0714 0812NDP0176 0812NRT1148
08-RIV--12.2/15.8Enter onto State Route 79 (Winchester Road) right-of-way between Scott Road and Domenigoni Parkway, near Murrieta area, to widen one side of the State highway from two to four lanes, including but not limited to drainage, erosion control, signal & ligState Route 79 (Winchester Road), Murrieta area 1 (05/17/2012)Details CEM-3701 Report
7273Project ID: 7273
EFIS: 0000001155
Permit Numbers: 08126RT0181
08-RIV-79-18.47/18.472Enter onto State Route 79 right-of-way at Stetson Avenue, in Winchester area, Riverside County, to perform roadway improvements including pavement widening, AC overlay, sidewalk, curb gutter, street lights, pedestrian access ramps, traffic signal.State Route 79 (Winchester Road), Winchester01/07/20071 (01/07/2007)Details CEM-3701 Report