Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16521-16530 of 18983 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214086Project ID: 214086
DEA: 040P3904
EFIS: 0417000432
04--,35,84,101,380-  10/01/20201 (10/01/2020)Details CEM-3701 Report
214101Project ID: 214101
Permit Numbers: 0417NMC1910
04-SM-82-9.35-10.07The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... 08/13/20212 (08/28/2019)Details CEM-3701 Report
214115Project ID: 214115
DEA: 043Q1104
EFIS: 0419000168
04-SCL-130-22.45Culvert Repair/replacement 03/18/20251 (09/10/2019)Details CEM-3701 Report
214116Project ID: 214116
Permit Numbers: 04186SN0955
04-SCL-101-44.8Right of way along project frontage and all improvements to hardscape are within the City of Sunnyvale limits. Traffic signals along west side of N. Fair Oaks are in Caltrans right of way. 01/22/20201 (04/26/2019)Details CEM-3701 Report
214125Project ID: 214125
DEA: 031G3404
EFIS: 0318000163
MINOR: 03A2846
03-SAC-80-12.3/16.6  07/22/20211 (06/26/2019)Details CEM-3701 Report
214128Project ID: 214128
DEA: 081F1404
EFIS: 0814000167
08---PERFORM SLAB REPLACEMENTS, MILL & OVERLAY & PROFILE GRINDING 02/01/20221 (06/24/2021)Details CEM-3701 Report
214233Project ID: 214233
MINOR: 04A5691
04---  03/18/20251 (02/03/2020)Details CEM-3701 Report
214144Project ID: 214144
Permit Numbers: 05166CD0356
05---  08/23/20211 (09/30/2019)Details CEM-3701 Report
214153Project ID: 214153
MINOR: 03A2891
03-SAC-99-33.4Replace AC Surfacing 05/07/20201 (06/26/2019)Details CEM-3701 Report
214158Project ID: 214158
DEA: 081J3904
EFIS: 0818000035
08-SBD-210-R25.5Widen off-ramp with HMA 01/14/20211 (12/23/2019)Details CEM-3701 Report