Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16451-16460 of 19352 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2951 | Project ID: 2951 DEA: 05330744 EFIS: 0500000501 | 05-SLO-46-32.1/36.7 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM. | SAN LUIS OBISPO COUNTY IN AND NEAR PASO ROBLES FROM AIRPORT ROAD TO 0.5 MILE WEST OF GENESEO ROAD | 08/22/2018 | 1 (10/25/2010) | Details CEM-3701 Report |
| 2950 | Project ID: 2950 DEA: 05330724 EFIS: 0500000499 | 05-SLO-46-36.6/41.2 | CONVERT 2-LANE HIGHWAY TO 4-LANE EXPRESSWAY. | SAN LUIS OBISPO COUNTY IN AND NEAR PASO ROBLES FROM 0.5 MILE WEST OF GENESEO ROAD TO 0.6 MILE EAST OF ALMOND DRIVE | 08/22/2018 | 1 (09/26/2012) | Details CEM-3701 Report |
| 2949 | Project ID: 2949 DEA: 05330714 | 05-SLO-46-51.7/59.8 | CONVERT 2 LANE HIGHWAY TO 4 LANE EXPRESSWAY | 08/29/2012 | 1 (09/19/2012) | Details CEM-3701 Report | |
| 2948 | Project ID: 2948 DEA: 05315924 EFIS: 0500000496 | 05-MON-1-160.7/163.3 | New Interchange To Be Constructed | 05/19/2014 | 1 (09/26/2012) | Details CEM-3701 Report | |
| 2947 | Project ID: 2947 DEA: 05314304 | 05-SB-101-R6.4 | CONSTRUCT AND RETROFIT SOUND WALL | IN SANTA BARBARA COUNTY NEARSUMMERLAND FROM 0.2 KM NORTHOF GARRAPATA CREEK TO PADAROLANE OVERCROSSING | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
| 2946 | Project ID: 2946 DEA: 05300184 Permit Numbers: 0507NMC0436 | 05-SLO-1- | CAMBRIA FLOOD MITIGATION PROJECT/ EA 05-0G7604 | Enter the work location. | 07/19/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 2945 | Project ID: 2945 DEA: 05300164 | 05-SLO-1-na | CONSTRUCT A REINFORCED CONCRETE BR OVER LEFFINGWELL CREEK MOONSTONE BEACH DR | Cambria, CA | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 2944 | Project ID: 2944 DEA: 05300134 | 05-SLO-101-50.64 | VINEYARD DRIVE INTERCHANGE IMPROVEMENTS EA 05-0H8404 | Enter the work location. | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 2943 | Project ID: 2943 DEA: 05282814 | 05-SB-150-1 | PLANTING AND IRRIGATION | IN SANTA BARBARA AND VENTURACOUNTIES NEAR CARPENTERIA FROM 1.6KM EAST TO 2.7 KM EAST OF ROUTE 150 AND 101 SEPARATION | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
| 2942 | Project ID: 2942 DEA: 051L2904 | 05-SM-101-6.62 | Wipple Ave and Northbound Route 101 Off-ramp in Redwood City (05A1521) | 03/18/2020 | 1 (08/08/2007) | Details CEM-3701 Report |
