Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16371-16380 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2424 | Project ID: 2424 DEA: 044S1304 | 04-SM-84-5.1/5.9 | CONSTRUCT RSP, COIR NETTING, AND DRAINAGE DITCH | NEAR LA HONDA | 03/27/2012 | 1 (08/27/2012) | Details CEM-3701 Report |
| 2423 | Project ID: 2423 DEA: 044S1004 EFIS: 0400001207 MINOR: 04A3691 | 04-SM-1-40.6 | REPAIR ROCK SLIDE WITH SHOTCRETE | IN SAN MATEO COUNTY IN PACIFICA AT 0.2 MILE SOUTH OF SAN PEDRO AVENUE | 1 (11/08/2019) | Details CEM-3701 Report | |
| 2422 | Project ID: 2422 DEA: 044S0104 EFIS: 0400001198 MINOR: 04A3425 | 04-NAP-29-4.1 | IN NAPA COUNTY NEAR NAPA 0.7 MILE SOUTH OF ROUTE 29/12 INTERSECTION ROCK SLOPE PROTECTION | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report | |
| 2421 | Project ID: 2421 DEA: 044S0004 | 04-MRN-101-8.8 | PLACE ROCK SLOPE PROTECTION | MARIN COUNTY IN LARKSPUR AT SIR FRANCIS DRAKE BOULEVARD OFF-RAMP | 06/13/2011 | 1 (04/05/2011) | Details CEM-3701 Report |
| 2420 | Project ID: 2420 DEA: 044R7704 | 04-SM-1-21.5 | ASPHALT CONCRETE SURFACING | IN SAN MATEO COUNTY IN AND NEAR HALF MOON BAY FROM 0.6 KM NORTH OFTUNITAS CREEK TO 0.3 KM SOUTH OFROUTE 92 | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2419 | Project ID: 2419 DEA: 044R7604 | 04-ALA-185-3.7 | RESURFACE ASPHALT CONCRETE | IN ALAMEDA COUNTY IN SAN LEANDROFROM BANCROFT AVENUE AND HESPERIANBOULEVARD TO DAVIS STREET AND JUNCTION 112 | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2418 | Project ID: 2418 DEA: 044R6704 | 04-NAP-29- 7.0 | RESURFACE ASPHALT CONCRETE | IN NAPA COUNTY AT THE GEORGE BUTLER BRIDGE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
| 2417 | Project ID: 2417 DEA: 044R5004 MINOR: 04A2487 | 04-SM-82-12.9-15.1 | Replace Trees | 1 (11/08/2019) | Details CEM-3701 Report | ||
| 2416 | Project ID: 2416 DEA: 044R4804 MINOR: 04A2285 | 04-SOL-505-R0.0 | CONNECTOR RAMP SHOULDER PAVEMENT | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report | |
| 2415 | Project ID: 2415 DEA: 044R4704 MINOR: 04A2329 | 04-SOL-505-R0.34 | REPLACE CONRETE PAVEMENT | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report |
