Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16331-16340 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5565 | Project ID: 5565 DEA: 100G4704 EFIS: 1000000046 COOP: 10366A | 10-SJ-5-25.0/32.7 | WIDEN BRIDGES AND FREEWAY WITH HMA & PCCP, AND CONSTRUCT SOUND WALLS. | SAN JOAQUIN COUNTY IN STOCKTON FROM 0.4 MILE NORTH OF 8TH STREET UNDERCROSSING TO HAMMER LANE UNDERCROSSING | 04/11/2017 | 1 (09/13/2013) | Details CEM-3701 Report |
| 214922 | Project ID: 214922 DEA: 100X3104 EFIS: 1013000265 | 10-SJ-99-16.8/17.6 | REPLACE BRIDGE. | SAN JOAQUIN COUNTY IN STOCKTON FROM 0.4 MILE SOUTH TO 0.4 MILE NORTH OF FARMINGTON ROAD OVERCROSSING | 04/07/2022 | 1 (04/28/2020) | Details CEM-3701 Report |
| 210657 | Project ID: 210657 DEA: 101C0904 EFIS: 1014000133 | 10-SJ-4,15,163-R16.6/R17.4 | REPAIR BRIDGE. YES, WE DO HAVE HOURS! OVER 300 AS OF JUNE | SAN JOAQUIN COUNTY IN STOCKTON FROM CENTER STREET TO UNION STREET | 04/11/2017 | 1 (09/23/2015) | Details CEM-3701 Report |
| 209315 | Project ID: 209315 DEA: 100X3804 EFIS: 1012000263 | 10-SJ-4-14.2/15.9 | REPAIR FAILED AREAS AND APPLY HMA. | SAN JOAQUIN COUNTY IN STOCKTON FROM CORDES RANCH ROAD UNDERCROSSING TO ROUTE 5/4 SEPARATION | 01/02/2015 | 1 (02/18/2014) | Details CEM-3701 Report |
| 211968 | Project ID: 211968 DEA: 101F0804 EFIS: 1016000116 | 10-SJ-4,26-19.75,1.1 | HEAT STRAIGHTENING EXISTING STEEL GIRDERS. | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 AT FARMINGTON ROAD OVERCROSSING AND ON ROUTE 26 AT ROUTE 26/99 SEPARATION. | 04/05/2018 | 1 (05/16/2017) | Details CEM-3701 Report |
| 215168 | Project ID: 215168 DEA: 101C5004 EFIS: 1016000026 | 10-SJ-4,5-T15.5/R16.7,25.8/26.5 | CONSTRUCT JPCP, CRCP, AND APPROACH SLABS. | SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 FROM 0.2 MILE EAST OF FRESNO AVENUE TO EL DORADO STREET AND ON ROUTE 5 FROM TAYLOR STREET OVERHEAD TO STOCKTON CHANNEL VIADUCT | 09/14/2023 | 1 (10/19/2020) | Details CEM-3701 Report |
| 993241 | Project ID: 993241 DEA: 101F7604 EFIS: 1017000024 | 10-SJ-12-R4.4 | REPLACE BRIDGE BEARING PADS. | SAN JOAQUIN COUNTY IN TERMINOUS AT LITTLE POTATO SLOUGH BRIDGE | 05/10/2023 | 1 (09/27/2021) | Details CEM-3701 Report |
| 994874 | Project ID: 994874 DEA: 101C3804 EFIS: 1018000272 | 10-SJ-205-L0.0/R13.2 | UPGRADE EXISTING MBGR TO THE MIDWEST GUARDRAIL SYSTEM. | SAN JOAQUIN COUNTY IN TRACY AND LATHROP AT VARIOUS LOCATIONS FROM 1.4 MILES WEST OF MOUNTAIN HOUSE PARKWAY OVERCROSSING TO 0.1 MILE EAST OF PARADISE CUT BRIDGE | 12/18/2024 | 1 (06/14/2023) | Details CEM-3701 Report |
| 208940 | Project ID: 208940 DEA: 100T1604 EFIS: 1000000271 | 10-SJ-26-18.5/19.0 | CURVE REALIGNMENT AND REPLACE BRIDGE. | SAN JOAQUIN COUNTY NEAR BELLOTA FROM 0.3 MILE WEST OF SANDSTONE CREEK BRIDGE TO SHELLY ROAD | 10/27/2014 | 1 (01/06/2014) | Details CEM-3701 Report |
| 215094 | Project ID: 215094 DEA: 101E5314 EFIS: 1016000031 | 10-SJ-88-22.1 | PLACE HMA & INSTALL LIGHTING, FLASHING BEACON & CAMERA SYSTEMS. | SAN JOAQUIN COUNTY NEAR CLEMENTS AT LIBERTY ROAD | 06/27/2022 | 1 (08/21/2020) | Details CEM-3701 Report |
