Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16281-16290 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5814 | Project ID: 5814 DEA: 100U0204 | 10-SJ-120-9.4/16.7 | Apply PME chip seal. | SAN JOAQUIN COUNTY IN AND NEAR ESCALON FROM 0.6 MILE EAST OF JACKTONE ROAD TO 0.2 MILE EAST OF IRWIN STREET | 08/25/2011 | 1 (08/25/2011) | Details CEM-3701 Report |
| 5750 | Project ID: 5750 DEA: 100S2804 | 10-SJ-5-R13.8/25.4 | RESURFACE HIGHWAY W/ RUBBERIZED HOT MIX | San Joaquin County in and near Lathrop and Stockton from Paradise Cut Overflow Bridge to Route 5/4 Separation. | 11/23/2009 | 1 (12/07/2009) | Details CEM-3701 Report |
| 211839 | Project ID: 211839 DEA: 101F5604 EFIS: 1016000089 | 10-SJ-5-R17.5/R22.1 | HOT MIX ASPHALT RESURFACING. | SAN JOAQUIN COUNTY IN AND NEAR LATHROP FROM LATHROP ROAD UNDERCROSSING TO 0.4 MILE NORTH OF HOSPITAL ROAD UNDERCROSSING | 01/24/2018 | 1 (04/17/2017) | Details CEM-3701 Report |
| 213012 | Project ID: 213012 DEA: 101H8804 EFIS: 1018000047 | 10-SJ-5-0.0/R17.5,R22.1/49.8 | REPLACE TRAFFIC STRIPE. | SAN JOAQUIN COUNTY IN AND NEAR LATHROP FROM STANISLAUS COUNTY LINE TO LATHROP ROAD UNDERCROSSING AND IN AND NEAR STOCKTON FROM 0.4 MILE NORTH OF HOSPITAL ROAD TO SACRAMENTO COUNTY LINE | 11/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211265 | Project ID: 211265 DEA: 101C9904 EFIS: 1014000190 | 10-SJ-5-R12.4/R17.5 | RUBBERIZED-HMA RESURFACING, REPAIR FAILED AREAS, REPLACE GUARDRAIL. | SAN JOAQUIN COUNTY IN AND NEAR LATHROP FROM TOM PAINE SLOUGH BRIDGE TO LATHROP ROAD UNDERCROSSING | 07/12/2017 | 1 (06/23/2016) | Details CEM-3701 Report |
| 993751 | Project ID: 993751 DEA: 101N5704 EFIS: 1021000212 | 10-SJ-5,205-R13.0,R13.1 | APPLY POLYESTER CONCRETE OVERLAY TO BRIDGE DECKS. | SAN JOAQUIN COUNTY IN AND NEAR LATHROP ON ROUTE 5 AT PARADISE CUT BRIDGE AND ON ROUTE 205 AT E205-N5 CONNECTOR RAMP | 05/09/2024 | 1 (04/29/2022) | Details CEM-3701 Report |
| 1000186 | Project ID: 1000186 DEA: 101Q2604 EFIS: 1022000259 | 10-SJ-99-28.4/29.7 | MODIFY TRAFFIC MONITORING STATIONS. | SAN JOAQUIN COUNTY IN AND NEAR LODI AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF HARNEY LANE OVERCROSSING TO 0.2 MILE NORTH OF ROUTE 99/12 SEPARATION | 07/24/2025 | 1 (03/18/2024) | Details CEM-3701 Report |
| 5833 | Project ID: 5833 DEA: 100U8304 | 10-SJ-12-10.0/15.0 | REPAIR FAILED AREAS AND APPLY SLURRY SEAL. | SAN JOAQUIN COUNTY IN AND NEAR LODI FROM 0.2 MILE WEST OF ROUTE 5/12 SEPARATION TO 0.2 MILE WEST OF LOWER SACRAMENTO ROAD | 12/28/2012 | 1 (04/18/2011) | Details CEM-3701 Report |
| 995011 | Project ID: 995011 DEA: 101H6504 EFIS: 1018000282 | 10-SJ-99-28.7/31.7 | HIGHWAY PLANTING AND IRRIGATION. | SAN JOAQUIN COUNTY IN AND NEAR LODI FROM 0.4 MILE NORTH OF HARNEY LANE OVERCROSSING TO 0.2 MILE NORTH OF TURNER ROAD OVERCROSSING | 1 (07/27/2023) | Details CEM-3701 Report | |
| 212936 | Project ID: 212936 DEA: 101G7804 EFIS: 1017000067 | 10-SJ-12-18.7/20.9 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND HOT MIX ASPHALT PAVING. | SAN JOAQUIN COUNTY IN AND NEAR LODI FROM GUILD AVENUE TO BRUELLA ROAD | 11/21/2018 | NOT VERIFIED | Details CEM-3701 Report |
