Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16231-16240 of 18854 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
5199Project ID: 5199
DEA: 081A0104
08-RIV-74-R23.5ASPHALT CONCRETE OVERLAYIN RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM MAPES ROAD TO NAVAJO ROAD12/23/20251 (04/16/2014)Details CEM-3701 Report
5200Project ID: 5200
DEA: 081A1304
08-SBD-62-47.5/49.4ASPHALT CONCRETE OVERLAYIN SAN BERNARDINO COUNTY IN TWENTYNINE PALMS ON ROUTE 62 FROM CEDAR AVENUE TO CHARLOTTE ROAD12/23/20251 (07/21/2006)Details CEM-3701 Report
5537Project ID: 5537
DEA: 100A5804
COOP: 100503
10-MER-140-27.0ASPHALT CONCRETE OVERLAYIN MERCED COUNTY NEAR MERCED FROM MC SWAIN ROAD TO 1.2 KM EAST OF APPLEGATE ROAD04/08/2011NOT VERIFIEDDetails CEM-3701 Report
6096Project ID: 6096
DEA: 11266504
11-SD-94-30.0/38.9ASPHALT CONCRETE OVERLAYIN SAN DIEGO COUNTY NEAR DULZURAAT VARIOUS LOCATIONS08/02/20101 (08/02/2010)Details CEM-3701 Report
6571Project ID: 6571
DEA: 120G7604
12-ORA-91-91ASPHALT CONCRETE OVERLAYIN ORANGE COUNTY IN YORBA LINDA FROM ROUTE 241 OFF RAMP TO 1 KM WEST OF COAL CANYON UNDERCROSSING07/28/20101 (07/28/2010)Details CEM-3701 Report
1680Project ID: 1680
DEA: 040E6904
04-MRN-1-19.8ASPHALT CONCRETE DIGOUTSIN MARIN COUNTY IN MARIN FROM 2.6 MILES NORTH OF BOLINAS ROAD TOOLEMA CREEK BRIDGE04/18/20111 (04/18/2011)Details CEM-3701 Report
5108Project ID: 5108
DEA: 080M9204
MINOR: 08A1861
08-SBD-138-3.62Asphalt ConcreteOn Rte 138 in SBd County near Sheep Creek Bridge01/11/2011NOT VERIFIEDDetails CEM-3701 Report
1224Project ID: 1224
DEA: 033M6004
03-PLA-267-3.7/6.7ASHPALT CONCRETE SURFACINGPLACER COUNTY NEAR TRUCKEE FROM 0.1 MILE WEST OF NORTHSTAR DRIVE TO BROCKWAY SUMMIT10/25/20101 (01/11/2010)Details CEM-3701 Report
995021Project ID: 995021
DEA: 04256204
EFIS: 0418000225
COOP: 042935;2699;2935
04-ALA-80-6.7/7.7Ashby Interchange Improvements  1 (12/27/2024)Details CEM-3701 Report
213821Project ID: 213821
Permit Numbers: 03186TN1303
03--70-1.2/1.2AsBuilts Install approximately 330 feet of 48" drain pipe and 60" steel casing east to west from the River Oaks Detention Basin, under SR 70, and terminating in the Algodon Slough/Canal.State Route 70, Plumas Lake 1 (10/05/2020)Details CEM-3701 Report