Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 16231-16240 of 17330 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
993126Project ID: 993126
DEA: 044K0404
EFIS: 0417000246
04-SM-1-31.2/32.0Mid-coast Multi-modal Trail Improvements ProjectSR 1 (PM 31.2/32.0) east of highway, from Mirada Road to Coronado Street in San Mateo County within El Granada08/30/20232 (07/12/2021)Details CEM-3701 Report
210571Project ID: 210571
Permit Numbers: 05156TK0276
05-SLO-1-15.34/16.44Replace/relocate 6 existing center bored or solid wooden pole street lights with Caltrans Type 15 lighting standard, standard mast arms, and standard cast in drilled hole foundation; and Pacific Gas and Electric Company supplied LED luminaires as a service to and under an agreement with the City ofSR 1, Pismo Beach10/15/20191 (07/06/2015)Details CEM-3701 Report
210560Project ID: 210560
Permit Numbers: 05126TK0629 05166RT0171 05166RT0636
05-SB-1-49.3/49.7Replace/relocate 10 existing center bored or solid wooden pole street lights with Caltrans Type 15 lighting standard, standard mast arms, and standard cast in drilled hole foundation; and Pacific Gas and Electric Company supplied LED luminaires as a service to and under an agreement with the City oSR 1, Pismo Beach, Oceano, Guadalupe08/16/20191 (07/09/2015)Details CEM-3701 Report
208892Project ID: 208892
Permit Numbers: 0313NMC0011 0313NRD1091
03-SAC-104-0.13/0.6widen road on North side to create 2 EB and 2 WB lanes and TWLT laneSR 104 (Twin Cities Road), Galt02/06/20151 (02/05/2014)Details CEM-3701 Report
7645Project ID: 7645
EFIS: 0000001155
Permit Numbers: 1010NMC0327 1012NDP0510
10-AMA-104-9.883/9.883Realign segment of Prospect Drive to connect to State Route (SR) 104 across from Bowers Drive creating a 4-way intersection in the City of Sutter Creek in Amador County. Two (2) way stop control on Bowers Drive and newly aligned Prospect Drive shall remainSR 104, Sutter Creek02/24/2014NOT VERIFIEDDetails CEM-3701 Report
8204Project ID: 8204
Permit Numbers: 1010NMC0327
10-AMA-104-9.9Realign segment of Prospect Drive to connect to State Route (SR) 104 across from Bowers Drive creating a 4-way intersection in the City of Sutter Creek in Amador County. Two (2) way stop control on Bowers Drive and newly aligned Prospect Drive shall remain at this intersection. Intersection shall bSR 104, Sutter Creek 1 (11/21/2014)Details CEM-3701 Report
7070Project ID: 7070
EFIS: 0000001155
Permit Numbers: 1010NSN0123
10-STA-108-24.8/24.8Widen the northbound southeast corner of State Highway 108/Briggsmore Avenue to accommodate the right turn lane from northbound SR 108 to eastbound Briggsmore Avenue. Work also includes the relocation of traffic signal standards and its appurtenances, conSR 108, Modesto10/09/20182 (08/07/2014)Details CEM-3701 Report
210273Project ID: 210273
Permit Numbers: 10146CD0054 10156RW0326 10166RT0109 10166RT0755 10176RT0748 10156RW0652
10---26.7/26.8Construct improvements at the Claratina/Pelandate Avenue intersection with McHenry Avenue (SR-108) in the City of Modesto in accordance with the approved plans and Special Provisions, which includes: signal modifications, storm drainage and water facilities, curb, gutter and sidewalk and paving impSR 108, Modesto 1 (03/12/2015)Details CEM-3701 Report
212422Project ID: 212422
Permit Numbers: 1016NSN0290 1016NRT0817 10176DP0289 1018NRT0057
10---26.6Construct improvements at the intersection of Grecian Avenue with McHenry Avenue (SR-108) in the City of Modesto in accordance with the approved plans and Special Provisions, which includes: signal installation, roadway modification and pavement markings and improvements.The applicant's contractSR 108, Modesto 1 (05/01/2017)Details CEM-3701 Report
212920Project ID: 212920
Permit Numbers: 10176MC0280 10186DP0026 10186RW0115
10---26.7/26.8Install new curb, gutter, sidewalk, a commercial driveway approach, and pavement widening along the southwest corner of Pelandale/Claratina/State Route 108 intersection in the City of Modesto. Other works includes a new pedestrian island, traffic signal modification, and a new horizontal drain. AllSR 108, Modesto01/22/20201 (11/28/2017)Details CEM-3701 Report