Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 16091-16100 of 19351 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 215027 | Project ID: 215027 DEA: 101H3424 EFIS: 1018000078 | 10-SJ-5-10.6 | BRIDGE RAIL REPLACEMENT. | SAN JOAQUIN COUNTY NEAR LATHROP AT DEUEL OVERHEAD | 05/03/2022 | 1 (06/15/2020) | Details CEM-3701 Report |
| 1000285 | Project ID: 1000285 DEA: 042Q4604 EFIS: 0419000015 | 04-SF-101-0.8,3.4 | BRIDGE RAIL REPLACEMENT. | THE CITY AND COUNTY OF SAN FRANCISCO AT THIRD STREET UNDERCROSSING AND AT TWENTY THIRD STREET OVERCROSSING. | 06/18/2026 | 1 (07/15/2024) | Details CEM-3701 Report |
| 995519 | Project ID: 995519 DEA: 030L0804 EFIS: 0324000025 | 03-SAC-51-5.5/5.5 | Bridge Rail Replacement due to Vehicle Strike | Marconi Bridge | 03/21/2025 | 1 (01/17/2024) | Details CEM-3701 Report |
| 994378 | Project ID: 994378 DEA: 040K6304 EFIS: 0416000111 | 04-NAP-29-16.4/19.0 | BRIDGE RAIL REPLACEMENT AND SHOULDER WIDENING. | NAPA COUNTY NEAR YOUNTVILLE AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF DRY CREEK BRIDGE TO 0.1 MILE NORTH OF CALIFORNIA DRIVE UNDERCROSSIG | 1 (10/27/2022) | Details CEM-3701 Report | |
| 994667 | Project ID: 994667 DEA: 034J6704 EFIS: 0323000277 | 03-ED-89-16/18 | Bridge Rail Replacement | Eagle Falls Viaduct | 1 (04/11/2023) | Details CEM-3701 Report | |
| 995004 | Project ID: 995004 DEA: 060U0004 EFIS: 0615000296 | 06-FRE,KER-33,58-70.6/76.0,27.8 | BRIDGE PREVENTIVE MAINTENANCE. | FRESNO AND KERN COUNTIES IN FIREBAUGH ON ROUTE 33 FROM POSO CANAL BRIDGE TO COLONY MAIN CANAL BRIDGE AND NEAR MCKITTRICK ON ROUTE 58 AT MAIN DRAIN CANAL BRIDGE | 05/09/2025 | 1 (07/27/2023) | Details CEM-3701 Report |
| 1002368 | Project ID: 1002368 DEA: 080N0404 EFIS: 0824000177 | 08-SBD-10-unknown | BRIDGE PREVENTIVE MAINTENANCE WORK WHICH INCLUDE BUT NOT LIMITED TO POLYESTER CONCRETE OVERLAY, REPLACE JOINT SEALS, AND METHACRYLATE | ON SBD 10 FROM E10-N15 CONNECTOR IN ONTARIO TO W10-N&S215 CONN/E ST - W10 ON-RAMP SEP IN COLTON. | 1 (07/02/2026) | Details CEM-3701 Report | |
| 215692 | Project ID: 215692 DEA: 101C8104 EFIS: 1015000038 | 01-MPA,MER,SJ,STA-4,5,49,88,99,etc.-Var | BRIDGE PREVENTIVE MAINTENANCE AND ROCK SLOPE PROTECTION. | MARIPOSA, MERCED, SAN JOAQUIN, AND STANISLAUS COUNTIES AT VARIOUS LOCATIONS | 12/05/2022 | 1 (05/17/2021) | Details CEM-3701 Report |
| 209496 | Project ID: 209496 DEA: 081C8904 EFIS: 0813000075 | 08-RIV-10-R110.4/R152.4 | BRIDGE PREVENTIVE MAINTENANCE | RIVERSIDE COUNTY NEAR AND IN BLYTHE FROM 4.9 MILES EAST OF ROUTE 177 TO 3.8 MILES EAST OF ROUTE 78 | 04/07/2015 | 1 (04/16/2014) | Details CEM-3701 Report |
| 993661 | Project ID: 993661 DEA: 051H4804 EFIS: 0516000079 | 05-SCR-1-13.3 | BRIDGE PREVENTATIVE MAINTENANCE - PLACE SCOUR PROTECTION. | IN SANTA CRUZ COUNTY IN CAPITOLA AT SOQUEL CREEK BRIDGE | 01/26/2024 | 1 (03/28/2022) | Details CEM-3701 Report |
