Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 1591-1600 of 19060 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213803 | Project ID: 213803 DEA: 031G4004 EFIS: 0318000169 | 03-COL,SUT,YUB-20-VAR | THERMOPLASTIC TRAFFIC STRIPING. | COLUSA, SUTTER AND YUBA COUNTIES AT VARIOUS LOCATIONS | 12/04/2019 | 1 (01/08/2019) | Details CEM-3701 Report |
| 993196 | Project ID: 993196 DEA: 081L3304 | 08-SBD-10,71-Var | THERMOPLASTIC TRAFFIC STRIPING, PAVEMENT MARKINGS, AND ROADSIDE SIGNS. | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS | 07/27/2022 | 1 (10/27/2021) | Details CEM-3701 Report |
| 993785 | Project ID: 993785 DEA: 081L3604 EFIS: 0820000061 | 08-RIV-10-26.9/43.3 | THERMOPLASTIC TRAFFIC STRIPING, PAVEMENT MARKINGS, AND ROADSIDE SIGNS. | RIVERSIDE COUNTY IN AND NEAR PALM SPRINGS, THOUSAND PALMS AND CATHEDRAL CITY FROM 0.3 MILE WEST OF WHITEWATER OVERCROSSING TO 0.3 MILE EAST OF BOB HOPE DRIVE OVERCROSSING | 03/27/2023 | 1 (09/13/2022) | Details CEM-3701 Report |
| 1000065 | Project ID: 1000065 DEA: 081P1304 EFIS: 0823000092 | 08-RIV,SBD-15,40,58,60,91,215-Var | THERMOPLASTIC TRAFFIC STRIPE AND THERMOPLASTIC PAVEMENT MARKING. | RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS | 01/06/2025 | 1 (02/06/2024) | Details CEM-3701 Report |
| 212691 | Project ID: 212691 DEA: 081G1914 EFIS: 0816000193 | 08-SBD-210-0.0/10.3 | THERMOPLASTIC TRAFFIC STRIPE AND MARKING. | SAN BERNARDINO COUNTY FROM LOS ANGELES COUNTY LINE TO 0.2 MILE WEST OF EAST AVENUE OVERCROSSING | 06/23/2021 | 1 (03/20/2018) | Details CEM-3701 Report |
| 215320 | Project ID: 215320 DEA: 043Q4704 EFIS: 0419000215 | 04-SCL-85-5.6/R17.8 | THERMOPLASTIC TRAFFIC STRIPE AND ASPHALTIC EMULSION (FOG SEAL COAT). | SANTA CLARA COUNTY FROM GUADALUPE RIVER BRIDGE TO 0.1 MILE NORTH OF STEVENS CREEK BOULEVARD OVERCROSSING | 03/27/2023 | 1 (12/07/2020) | Details CEM-3701 Report |
| 1000174 | Project ID: 1000174 DEA: 010M9104 EFIS: 0123000092 | 01-DN,HUM,LAK,MEN-29,101-Var | THERMOPLASTIC PAVEMENT MARKINGS, TRAFFIC STRIPE & PAVEMENT MARKERS. | DEL NORTE, HUMBOLDT, LAKE, AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS | 12/29/2025 | 1 (03/25/2024) | Details CEM-3701 Report |
| 994824 | Project ID: 994824 DEA: 081N1404 EFIS: 0822000104 | 08-RIV,SBD-10,15,18,38,60,etc.-Var | THERMOPLASTIC PAVEMENT MARKING AND THERMOPLASTIC TRAFFIC STRIPE. | RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS | 12/10/2024 | 1 (08/02/2023) | Details CEM-3701 Report |
| 215565 | Project ID: 215565 Permit Numbers: 0320AOP1078 | 03-ED-50-16.4/16.8 | The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of Placerville | N/A, Placerville | 2 (04/19/2021) | Details CEM-3701 Report | |
| 7475 | Project ID: 7475 DEA: 04445604 EFIS: 0400001081 COOP: 042434 Permit Numbers: 0412NMC0872 0412NDP1643 | 04-SCL-280-5.1/5.2,0.0/0.8 | The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, widening | In San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing | 05/07/2019 | 2 (12/11/2012) | Details CEM-3701 Report |
