Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15971-15980 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2832 | Project ID: 2832 DEA: 050R2004 EFIS: 0500000347 | 05-MON-101-86.6/R87.7 | HWY PLANTING, IRRIGATION, GATES, GORE & PULLOUT PAVING WORK, | MONTEREY COUNTY IN SALINAS FROM 0.2 MILE SOUTH OF JUNCTION ROUTE 68/101 SEPARATION TO 0.2 MILE SOUTH OF SHERWOOD DRIVE OVERCROSSING | 06/21/2013 | 1 (12/20/2010) | Details CEM-3701 Report |
| 2831 | Project ID: 2831 DEA: 050Q9804 EFIS: 0500000344 MINOR: 05A1211 | 05-MON-1-68.81 | Cured In Place Pipe Liner | Monterey County Near Carmel | 03/19/2020 | 1 (11/08/2019) | Details CEM-3701 Report |
| 2830 | Project ID: 2830 DEA: 050Q9704 | 05-MON-68-R4.5/15.3 | CENTERLINE RUMBLE STRIP | MONTEREY COUNTY NEAR DEL REY OAKS FROM 0.7 MILE WEST OF JOSSELYN CANYON ROAD TO 0.5 MILE WEST OF TORRO PARK UNDERCROSSING | 08/29/2012 | 1 (09/07/2012) | Details CEM-3701 Report |
| 2829 | Project ID: 2829 DEA: 050Q9604 EFIS: 0500000342 | 05-MON-68-R4.1/R4.5,15.2/15.8 | CONSTRUCT CONCRETE MEDIAN BARRIER. | MONTEREY COUNTY IN MONTEREY FROM 0.1 MILE TO 0.5 MILE EAST OF FAIRGROUND ROAD OVERCROSSING AND NEAR SALINAS FROM 0.5 MILE WEST OF TORO PARK UNDERCROSSING TO TORO PARK UNDERCROSSING | 01/17/2014 | 1 (03/28/2011) | Details CEM-3701 Report |
| 2828 | Project ID: 2828 DEA: 050Q9504 | 05-SLO-227-0.9/7.1 | Apply Chip Seal, Shoulder Backing And Fog Seal Coat. | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2827 | Project ID: 2827 DEA: 050Q9304 | 05-MON-1-72.9/74.6 | Place Hot Mix Asphalt (bonded Wearing Course) On Existing Pavement | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2826 | Project ID: 2826 DEA: 050Q9204 | 05-MON-146-0.0/1.5 | APPLY SLURRY SEAL COAT ON EXISTING PAVMENT | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2825 | Project ID: 2825 DEA: 050Q9104 | 05-MON,SBT-25-0.0/11.8,0.0/3.5 | SEAL COAST EXISTING ROADWAY | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2824 | Project ID: 2824 DEA: 050Q9004 | 05-SB-150-0.0/2.2 | PLACE CHIP SEAL COAT ON EXISTING ROADWAY | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report | |
| 2823 | Project ID: 2823 DEA: 050Q8904 | 05-MON,SLO-1-VAR | Overlay Existing Roadbed With Hma (type A) | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
