Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15801-15810 of 18768 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001319 | Project ID: 1001319 DEA: 051P6814 EFIS: 0523000314 | 05-SB-101-18.2/18.2 | BROADBANDMM CHILD | 1 (06/23/2025) | Details CEM-3701 Report | ||
| 213577 | Project ID: 213577 DEA: 56930713 EFIS: 0016000324 MINOR: 02A1726 | 56-SHA-- | Brine Tank Project- Installation of Salt Brine Making System and relocation of storage tank. | Mount Shasta Maintenance Station 1625 Mott Road MT Shasta, CA 96067 | 08/11/2023 | 1 (09/04/2018) | Details CEM-3701 Report |
| 995039 | Project ID: 995039 DEA: 080P4004 EFIS: 0800020205 | 08-SBD-I-15-unknown | Brightline West 218-mile High-Speed Rail connecting Las Vegas, Nevada to Southern California. Includes stations in Apple Valley, Hesperia, and Rancho Cucamonga. | I-15 median, with stations in Apple Valley, Hesperia, and Rancho Cucamonga. | 2 (10/28/2024) | Details CEM-3701 Report | |
| 210676 | Project ID: 210676 DEA: 09362904 EFIS: 0915000022 MINOR: 09A0622 | 09-MNO-395-75.9 | Bridgeport Maintenance Station Paving Project | IN MONO COUNTY 0.5 MILE SOUTH OF BRIDGEPORT ON SHOP ROAD AT THE BRIDGEPORT MAINTENANCE STATION. | 08/14/2015 | 1 (07/23/2015) | Details CEM-3701 Report |
| 209940 | Project ID: 209940 DEA: 04014124 EFIS: 0415000019 | 04-ALA-80-2.0 | Bridge Yard Slab Replacement | 210 Burma Rd | 1 (09/16/2014) | Details CEM-3701 Report | |
| 6703 | Project ID: 6703 DEA: 120J5304 | 12-ORA-73,55-R26.6,5.5 | BRIDGE WORK, GROOVE CONCRETE PAVEMENT, TRAFFIC STRIPE,LOOP DETECTOR | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 994875 | Project ID: 994875 DEA: 101F1804 EFIS: 1016000077 | 10-SJ-4-R16.0/R19.4 | BRIDGE WORK, CONCRETE BARRIER, AND INSTALL RAMP METER SYSTEM. | SAN JOAQUIN COUNTY IN STOCKTON AT VARIOUS LOCATIONS FROM 0.3 MILE EAST OF ROUTE 4/5 SEPARATION TO 0.4 MILE WEST OF ROUTE 4/99 SEPARATION | 1 (06/14/2023) | Details CEM-3701 Report | |
| 213583 | Project ID: 213583 DEA: 060H2004 EFIS: 0612000157 | 06-TUL-201,216-12.5,21.2,18.7 | BRIDGE WIDENING, UPGRADE LANES AND OUTSIDE SHOULDERS. | TULARE COUNTY NEAR CUTLER ON ROUTE 201 AT SAND CREEK BRIDGE AND AT FRIANT KERN CANAL BRIDGE AND NEAR WOODLAKE ON ROUTE 216 AT KAWEAH RIVER BRIDGE | 11/29/2021 | 1 (09/25/2018) | Details CEM-3701 Report |
| 208838 | Project ID: 208838 DEA: 030F2304 EFIS: 0300000073 | 03-SAC-50-L1.3/L2.2 | BRIDGE WIDENING, PCC OVERLAY AND REPLACE CONCRETE BARRIER. | SACRAMENTO COUNTY IN SACRAMENTO AT CAMELLIA CITY VIADUCT FROM 0.3 MILE EAST OF RIVERSIDE BOULEVARD UNDERCROSSING TO 26TH STREET UNDERCROSSING | 01/30/2015 | 1 (07/22/2013) | Details CEM-3701 Report |
| 213682 | Project ID: 213682 DEA: 11430184 EFIS: 1117000215 | 11-SD-805-8.4/8.8 | Bridge widening, HMA, barrier, drainage, RCP, and landscape work near Sweetwater River Bridge in Chula Vista. Widening of Sweetwater River Bridge in Chula Vista on 805. | Near Sweetwater River Bridge in Chula Vista on 805. | 09/14/2023 | 1 (06/01/2020) | Details CEM-3701 Report |
