Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15791-15800 of 17367 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210183Project ID: 210183
Permit Numbers: 04146DP2269 0413NMC2337
04-SM-101-3.5/3.5The proposed project will include widening the northbound off-ramp on the western side of the approach to accommodate an additional right-turn lane.Route 101, Menlo Park09/14/20181 (02/06/2015)Details CEM-3701 Report
213625Project ID: 213625
DEA: 11428504
EFIS: 1117000090
COOP: 118435
Permit Numbers: 11176DP0844
11-SD-75-12.65-13.15The proposed SR-75 and Hooper Boulevard intersection improvement project (PROJECT) will be part of the offsite improvements for P-947 Coastal Campus Entry Control Point Project beginning at STA 12+87 and ending at STA 33+53SR-75 and Hooper Boulevard Intersection 2 (09/12/2018)Details CEM-3701 Report
993108Project ID: 993108
Permit Numbers: 0421NMC2009
04---47.7/47.9The proposed widening of the NB 101 off-ramp at Moffett Blvd includes the following improvements within Caltrans right-of-way; constructing an additional NB right-turn lane, replacement MVP, and sidewalk and curb ramp, concrete barrier installation, modification of traffic signal and detector loopsNorthbound Off-Ramp at Moffett Blvd, Mountain View03/27/20231 (07/16/2021)Details CEM-3701 Report
6858Project ID: 6858
DEA: 043A7734
Permit Numbers: 0412NRT0901 0412NRT0913 0411NDP1529 0410NMC0139
04-CC--0/5The purpose of the I-80 Integrated Corridor Mobility (ICM) Traffic Signal Light Synchronization project (TLSP) is to assist in monitoring, and managing the traffic flow along the I-80 and State Route 123 corridor.I-80 AND SR 123, Var08/16/20131 (12/21/2012)Details CEM-3701 Report
214924Project ID: 214924
DEA: 080M9004
EFIS: 0812000248
COOP: 081695
08-RIV-111-18.0/19.0The purpose of the project is to provide a grade separated crossing over the existing UPRR, SR-111 and Hammond Road in the Mecca Community that will provide the following benefits: provide a secondary access point to the Community of Mecca.The project is in Riverside County from 0.47 miles east of State Route 86 to 0.45 miles west of Johnson Street. 2 (04/22/2020)Details CEM-3701 Report
210469Project ID: 210469
DEA: 042J1504
EFIS: 0414000432
04-CC-4,80,580,680-VarTHE REPLACEMENT OF OVERHEAD SIGNS WITH HIGH-PERFORMANCE REFLECTIVE SIGNS, REMOVAL OF EXISTING SIGNAGE LIGHTING, AND REMOVAL OF GANTRY CATWALKS ON SIGN-GANTRY STRUCTURES, WITHIN VARIOUS COUNTIESIN CONTRA COSTA COUNTY AT VARIOUS LOCATIONS12/21/20171 (03/20/2017)Details CEM-3701 Report
209466Project ID: 209466
DEA: 041J6504
EFIS: 0414000313
04-SOL-84-12.09The required temporary repairs include replacing deteriorated timber planks and stringers, placing corrugated metal over the existing timber deck system, and replacing asphalt concrete surfacing.Near Rio Vista at the Miner Slough Bridge05/26/20161 (03/31/2014)Details CEM-3701 Report
8159Project ID: 8159
Permit Numbers: 0412NMC0383 04136DP0013 0413NRW0185
04-ALA-123-4.4/4.43The San Pablo and Marin Avenue intersection consists of the following improvements:1. ADA compliant curb ramps.2. High visibility crosswalk in all four reaches of the intersection.3. Modified signal timing and equipment for eastbound bike/ped phase.4. AddSan Pablo Avenue , Albany10/21/20141 (11/28/2012)Details CEM-3701 Report
214677Project ID: 214677
DEA: 081F2604
EFIS: 0814000194
COOP: 081696
08-SBD-60-R7.83/R7.91The scope features right turn pockets, additional left turn pockets onto ramps from Archibald Avenue , widen ramps to accommodate additional lane and the enhancements of sidewalks,crosswalks amd curb rampsSR-60 and Archibald Avenue between East Oak Hill and Monticello Place08/19/20212 (01/30/2020)Details CEM-3701 Report
210489Project ID: 210489
DEA: 080F6314
EFIS: 0813000220
08-SBD-395-11.2/16.6The scope of project is widening approximately 5 miles of US 395 from two lanes to four lanes, repave existing lanes, modify five signals, upgrade ADA access, add turn lanes, add sound walls, and extend bridgeProject Limits are PM 11.2 from 16.6 and US 395.08/19/20212 (01/03/2019)Details CEM-3701 Report