Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15751-15760 of 17367 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
215272Project ID: 215272
DEA: 031J7204
EFIS: 0321000053
03-COL,COL YOL-16,16 128-VariousThe major itmes of work include culverts replacement/cleaning erosion control measures. Fence replacement, ditch clearing, traffic control, and incidental work. 07/22/20211 (11/30/2020)Details CEM-3701 Report
210464Project ID: 210464
DEA: 04264054
EFIS: 0415000120
COOP: 042552
04-MRN-101-The Marin-Sonoma Narrows (MSN) High Occupancy Vehicle (HOV) Widening ProjectOff State Highway System- along U.S. 101, south of the Route 37 interchange in the City of Novato (Marin County), and ending north of the Corona Road Overcrossing in the City of Petaluma 1 (08/19/2019)Details CEM-3701 Report
209832Project ID: 209832
Permit Numbers: 04116MC1661
04-SCL-85-5.9/5.9The Modification of the northeast corner of the Hwy NB 85 offramp AT Almaden Expressway and associated work consists of asphalt paving,curb and gutter,sidewalk,signal modifications, joint trench and a new riser pole and guy.Almaden Expressway, San Jose09/14/20181 (10/06/2014)Details CEM-3701 Report
209833Project ID: 209833
Permit Numbers: 0412NMC1622
04-SCL-85-5.9/5.9The modification of the northest corner of the NB HWY 85 offramp at Almaden Expressway and adding a fourth lane transitions.Almaden Expressway, San Jose08/21/20181 (10/06/2014)Details CEM-3701 Report
211185Project ID: 211185
Permit Numbers: 04156DP0887 04146CS0327 04156RW2568 04156RT2624
04-SCL-82-13.1/13.1The off-site improvements include the removal and replacement of the sidewalk,curb,gutter,and driveway.2611- 2655 El Camino Real, Santa Clara01/18/20191 (02/01/2016)Details CEM-3701 Report
215568Project ID: 215568
DEA: 044H4404
EFIS: 0413000251
04-CC-4-33.4/0The overcrossing will include a multi-span bridge with a column in the Highway 4 median. Bridge approaches will be constructed on earthen embankments. The path will range from 12 to 16 feet in width.The Mokelumne Trail Bicycle/Pedestrian Overcrossing project will construct a pedestrian and bicycle bridge that spans Highway 4 – closing a gap along the Mokelumne Trail, and providing safe access for bicyclists and pedestrians. 2 (03/11/2021)Details CEM-3701 Report
993214Project ID: 993214
Permit Numbers: 0420NSN2101 0421NRT2638
04-ALA--1.575The Pedestrian Hybrid Beacon (Federal Aid Project No. HSIPL 5008 (151), City project no. PW1604) includes the installation of a Pedestrian Hybrid Beacon at Davis Street and Davis Street and Carpentier Street.Davis St., San Leandro 1 (09/02/2021)Details CEM-3701 Report
214101Project ID: 214101
Permit Numbers: 0417NMC1910
04-SM-82-9.35-10.07The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points... 08/13/20212 (08/28/2019)Details CEM-3701 Report
214172Project ID: 214172
Permit Numbers: 0417NMC1910 04196DP0966
04-SM-82-9.35/10.07The Peninsula Corridor Joint Powers Board (JPB), which operates the San Francisco Bay Area's Caltrain passenger rail intends to extend 28th Avenue and 31st Avenue west of El Camino Real (SR 82) in the same location as existing driveway access points...S. El Camino Real, San Mateo03/16/20211 (05/22/2019)Details CEM-3701 Report
214953Project ID: 214953
DEA: 063HT024
EFIS: 0617000190
06-KER-VAR-The Project consists of 21 miles of trackway for the High?Speed Rail through the counties of Tulare and Kern in the vicinity of Wasco, California. It includes several grade separated crossings, a pedestrian crossing, and a non-standard structure.Counties of Tulare and Kern at SR43/SR46 2 (05/05/2020)Details CEM-3701 Report