Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15721-15730 of 18854 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209263 | Project ID: 209263 DEA: 080F6604 EFIS: 0800000146 | 08-SBD-247-1.8/9.6 | CONSTRUCT SHOULDERS, COLD PLANE AND HMA OVERLAY | SAN BERNARDINO COUNTY IN AND NEAR YUCCA VALLEY FROM EL CORTEZ ROAD TO HANDLEY ROAD | 06/13/2016 | 1 (04/16/2014) | Details CEM-3701 Report |
| 5020 | Project ID: 5020 DEA: 080K8804 | 08-SBD-62-7.6/8.5 | MEDIAN BARRIER, DRAINAGE, METAL BEAM GUARD RAIL AND SMART CUSHION | SAN BERNARDINO COUNTY IN AND NEAR YUCCA VALLEY FROM YUCCA PARK ROAD TO SHAFTNER AVENUE | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
| 5126 | Project ID: 5126 DEA: 080N7004 | 08-SBD-18-87.9/101.0 | RHMA (GAP GRADED) OVERLAY | SAN BERNARDINO COUNTY IN APPLE VALLEY AND VICTORVILLE FROM CENTRAL ROAD TO ROUTE 18/395 SEPARATION | 06/13/2011 | 1 (04/19/2010) | Details CEM-3701 Report |
| 211918 | Project ID: 211918 DEA: 081E0804 EFIS: 0813000142 | 08-SBD-18-88.9/89.6 | CONSTRUCT RAISED-CURB MEDIAN | SAN BERNARDINO COUNTY IN APPLE VALLEY FROM NAVAJO ROAD TO KIOWA ROAD | 08/09/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 215039 | Project ID: 215039 DEA: 081H4004 EFIS: 0817000031 | 08-SBD-40-0.4 | MINOR CONCRETE (MINOR STRUCTURE). | SAN BERNARDINO COUNTY IN BARSTOW AT 0.4 MILE EAST OF ROUTE 15 | 06/30/2021 | 1 (10/21/2020) | Details CEM-3701 Report |
| 5093 | Project ID: 5093 DEA: 080M5004 | 08-SBD-40-S0.0/S0.8 | COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED) | SAN BERNARDINO COUNTY IN BARSTOW FROM 0.2 MILE WEST OF MAIN STREET OVERCROSSING TO EAST MAIN STREET | 10/28/2011 | 1 (10/28/2011) | Details CEM-3701 Report |
| 210379 | Project ID: 210379 DEA: 081F5304 EFIS: 0814000244 | 08-SBD-15-70.1/75.3 | REHABILITATE PAVEMENT, FOG SEAL SHOULDERS | SAN BERNARDINO COUNTY IN BARSTOW FROM ROUTE 58 TO 0.2 MILE NORTHEAST OF RIVERSIDE DRIVE | 06/13/2016 | 1 (10/15/2015) | Details CEM-3701 Report |
| 213105 | Project ID: 213105 DEA: 080R4314 | 08-SBD-38-50.4/59.4 | ROUTE 38 SEDIMENT CONTROLS WITH HYDROMULCH & GRAVEL (PHASE 1) | SAN BERNARDINO COUNTY IN BIG BEAR LAKE AT VARIOUS LOCATIONS FROM NORTH DIVISION DRIVE TO ROUTE 18 | 02/22/2019 | 1 (04/09/2018) | Details CEM-3701 Report |
| 5076 | Project ID: 5076 DEA: 080M0204 EFIS: 800000454 | 08-SBD-5712- | CONSTRUCT COMPRESSED NATURAL GAS (CNG) FUELING STATION. | SAN BERNARDINO COUNTY IN BLOOMINGTON AT MAGANA-ORTEGA MAINTENANCE STATION | 05/29/2014 | 1 (05/09/2011) | Details CEM-3701 Report |
| 211904 | Project ID: 211904 DEA: 081C6004 | 08-SBD-71-R6.9/R7.8 | SEDIMENT STABILIZATION, EROSION CONTROL | SAN BERNARDINO COUNTY IN CHINO AND CHINO HILLS FROM 0.4 MILE SOUTH OF PINE AVENUE TO 0.2 MILE NORTH OF EUCLID AVENUE | 01/06/2020 | 1 (01/07/2019) | Details CEM-3701 Report |
