Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15531-15540 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 5109 | Project ID: 5109 DEA: 080M9804 | 08-SBD-62,95-122.0/142.3,0.0/9.7 | REPLACE ASPHALT CONCRETE SURFACING AND PLACE HMA TYPE A OVERLAY | SAN BERNARDINO COUNTY AT AND NEAR VIDAL JUNCTION ON ROUTE 62 FROM 3.8 MILES WEST OF ROUTE 62/95 SEPERATION TO 0.3 MILE WEST OF ARIZONA STATE LINE AND ON ROUTE 95 FROM SAN BERNARDINO COUNTY LINE TO ROUTE 62/95 SEPERATION | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
| 5096 | Project ID: 5096 DEA: 080M5604 | 08-SBD-5708- | REPLACE PAVEMENT | SAN BERNARDINO COUNTY AT ANGELUS OAKS AT THE CAMP ANGELUS MAINTENANCE STATION AT 37710 HIGHWAY 38 | 06/13/2011 | 1 (04/19/2010) | Details CEM-3701 Report |
| 209129 | Project ID: 209129 DEA: 080J0104 EFIS: 0800000278 | 08-SBD-18-53.5 | CONSTRUCT LEFT TURN IN BOTH DIRECTIONS, WIDEN SHOULDER WEST BOUND | SAN BERNARDINO COUNTY AT BIG BEAR CITY AT BIG TREE DRIVE | 09/08/2014 | 1 (10/08/2013) | Details CEM-3701 Report |
| 1000163 | Project ID: 1000163 DEA: 081N7104 EFIS: 0823000039 | 08-SBD-138-32.2,37.2 | ALTERNATIVE PIPELINER, CLEANING, INSPECTING, AND PREPARING CULVERT. | SAN BERNARDINO COUNTY AT CRESTLINE AT 1.2 MILES NORTH OF OLD MILL ROAD AND AT 0.2 MILE SOUTH OF CRESTLINE CUT-OFF | 12/02/2024 | 1 (05/15/2024) | Details CEM-3701 Report |
| 7689 | Project ID: 7689 DEA: 080K2504 EFIS: 0800020490 | 08-SBD-40-R3.0/R28.1 | HMA OVERLAY AND METAL BEAM GUARD RAILING | SAN BERNARDINO COUNTY AT DAGGETT AND NEW BERRY FROM 0.4 MILE WEST OF SOUTH IWO JIMA AVENUE UNDERCROSSING TO 0.2 MILE WEST OF DESERT OASIS SAFETY ROADSIDE REST AREA | 01/29/2015 | 1 (10/29/2012) | Details CEM-3701 Report |
| 1000181 | Project ID: 1000181 DEA: 081N7404 EFIS: 0823000044 | 08-SBD-15-R19.6 | MINOR CONCRETE (INVERT PAVING). | SAN BERNARDINO COUNTY AT DEVORE AT 0.4 MILES SOUTH OF CAJON BOULEVARD | 11/04/2024 | 1 (05/15/2024) | Details CEM-3701 Report |
| 994191 | Project ID: 994191 DEA: 081G8304 EFIS: 0816000079 | 08-SBD-40-R100.8/R101.8 | HMA, STRUCTURAL CONC, BAR REINFORCING STEEL, CRSP & IMPORTED BORROW. | SAN BERNARDINO COUNTY AT ESSEX FROM 1.1 MILES EAST OF ESSEX ROAD OVERCROSSING TO 0.5 MILE EAST OF HALFWAY HILLS WASH BRIDGE | 08/29/2025 | 1 (03/30/2023) | Details CEM-3701 Report |
| 208757 | Project ID: 208757 DEA: 080R8604 EFIS: 0812000202 | 08-SBD-38-51.9 | BUILD A SAND HOUSE, STORAGE BINS, WASH RACK AND PAVE | SAN BERNARDINO COUNTY AT FAWNSKIN AT THE FAWNSKIN MAINTENANCE STATION | 11/26/2014 | 1 (10/28/2013) | Details CEM-3701 Report |
| 7699 | Project ID: 7699 DEA: 080Q7304 EFIS: 0800020455 | 08-SBD-62-15.1/29.3 | PAVEMENT REHABILITATION | SAN BERNARDINO COUNTY AT JOSHUA TREE AND TWENTYNINE PALMS FROM YUCCA MESA ROAD TO BERMUDA AVENUE | 11/27/2013 | 1 (12/10/2012) | Details CEM-3701 Report |
| 5040 | Project ID: 5040 DEA: 080L3204 COOP: 080378 | 08-SBD-395-33.4/45.9 | INSTALL CENTERLINE RUMBLE STRIP | SAN BERNARDINO COUNTY AT KRAMER FROM 4.4 MILES SOUTH OF KRAMER ROAD TO 0.1 MILE SOUTH OF ROUTE 395/58 SEPARATION | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
