Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15371-15380 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6683 | Project ID: 6683 DEA: 120J1904 | 12-ORA-405-18.0 | FLATTEN THE SLOPE, REMOVE AND INSTALL GUARD RAIL AND WIDEN SHOULDER | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6684 | Project ID: 6684 DEA: 120J2204 EFIS: 1200000259 MINOR: 12A1184 | 12-ORA-405-9.4 | IN ORANGE COUNTY, IN COSTA MESA, NORTH BOUND ROUTE 405 AT BRISTOL STREET OVER CROSSING, INSTALL GUARD RAIL. | 09/30/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 6685 | Project ID: 6685 DEA: 120J2204 EFIS: 1200000259 MINOR: 12A1191 | 12-ORA-405-9.38 | 09/30/2011 | NOT VERIFIED | Details CEM-3701 Report | ||
| 6686 | Project ID: 6686 DEA: 120J2304 | 12-ORA-91-R13.3/R13.6 | WIDENING EXISTING RAMP | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6687 | Project ID: 6687 DEA: 120J2404 | 12-ORA-1-23.1/24.3 | ADJUST TRAFFIC CONTROL DEVICES | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6688 | Project ID: 6688 DEA: 120J2604 | 12-ORA-405-10.7/12.1 | GISLER CHANNEL EMBANKEMENT REPAIR AND DITCH CONSTRUCTION | 08/12/2010 | 1 (08/12/2010) | Details CEM-3701 Report | |
| 6689 | Project ID: 6689 DEA: 120J2704 | 12-ORA-55-5.5 | SLOPE PAVING AND SIDEWALK IMPROVEMENTS | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6691 | Project ID: 6691 DEA: 120J3104 | 12-ORA-405-7.8/8.4 | MODIFY STRIPING, PAVEMENT MARKING AND SIGNING | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 6692 | Project ID: 6692 DEA: 120J3304 EFIS: 1200000268 MINOR: 12A1155 | 12-ORA-12,39-5.1 | INTERSECTION IMPROVEMENTS ON BEACH BLVD | 09/30/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 6693 | Project ID: 6693 DEA: 120J3604 | 12-ORA-12-42.30 | REMOVE AND REPLACE DAMAGED BRIDGE EXPANSION JOINT UNITS | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
