Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15151-15160 of 18756 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210719Project ID: 210719
DEA: 043G3054
EFIS: 0412000095
04-SM,SM-92,84,92-15.3/15.5REPLACE NAVIGATION AND DECORATIVE LIGHTS, RADAR BEACONS AND FOGHORNSIN THE CITY AND COUNTY OF SAN FRANCISCO AND SAN MATEO COUNTY AT VARIOUS LOCATIONS (SFOBB West Span, San Mateo Bridge, and Dumbarton Bridge)05/01/20231 (09/16/2015)Details CEM-3701 Report
995340Project ID: 995340
DEA: 051Q8504
EFIS: 0523000080
05-SLO-101-5714Replace network hardware, replace servers, replace storage, replace server and network racks, replace cabling (network and power), transfer and restore data from damage servers 09/16/20251 (11/16/2023)Details CEM-3701 Report
211766Project ID: 211766
DEA: 071XA304
EFIS: 0717000029
07-VEN-101-9.0Replace non-operational overhead EMS system.  1 (09/06/2016)Details CEM-3701 Report
6075Project ID: 6075
DEA: 11259804
EFIS: 1100000200
11-SD-78-15.3/15.7REPLACE NORDAHL BRIDGE AND WIDEN OFF-RAMP.SAN DIEGO COUNTY IN ESCONDIDO AND SAN MARCOS FROM 0.2 MILE WEST TO 0.2 MILE EAST OF NORDAHL ROAD OVERCROSSING10/10/20131 (03/29/2012)Details CEM-3701 Report
5468Project ID: 5468
DEA: 09943404
EFIS: 0914902296
09-INY-395-L5505Replace Office diesel oil tank and fuelIn Bishop at District 9 Office facility01/01/20141 (06/01/2011)Details CEM-3701 Report
248Project ID: 248
DEA: 01479204
EFIS: 0100020269
01-LAK-29,53-20.1/20.4,0.0/2.9REPLACE OGAC, INSTALL IN-GROUND RUMBLE STRIP, RECONSTRUCT MBGRLAKE COUNTY ON ROUTE 29, FROM 0.2 MILE SOUTH OF ROUTE 53 TO 0.1 MILE NORTH OF ROUTE 53; ON ROUTE 53, FROM ROUTE 29 TO 0.1 MILE SOUTH OF 40TH AVENUE04/05/20131 (10/17/2011)Details CEM-3701 Report
211964Project ID: 211964
DEA: 073W3704
07-LA-105-R2.2/R13.5REPLACE OH SIGN PANELS.LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM ROUTE 105/405 SEPARATION TO ROUTE 105/710 SEPARATION08/23/20181 (10/10/2017)Details CEM-3701 Report
8172Project ID: 8172
DEA: 044H0704
EFIS: 0413000143
04-SF-80-Replace one precast concrete barrier.San Francisco I-8002/12/20251 (12/13/2012)Details CEM-3701 Report
7322Project ID: 7322
DEA: 034M6204
EFIS: 0312000215
03-SAC-160-L6.98Replace Operating Ropes with New OnesSouth of Isleton at the 3 mile Slough Bridge12/08/20171 (05/22/2012)Details CEM-3701 Report
993813Project ID: 993813
DEA: 01401104
EFIS: 0100000154
01-MEN-1-43.3/44.2Replace or rehabilitate the Albion River Bridge with a structure that will ensure the safety and reliability on State Route 1.Albion River Bridge 1 (05/16/2022)Details CEM-3701 Report