Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15151-15160 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6284 | Project ID: 6284 DEA: 112T0824 | 11-SD-15-R48.3/R50.7 | CONSTRUCT MANAGED LANES NORTH SEGMENT #2 | 10/24/2012 | 1 (10/24/2012) | Details CEM-3701 Report | |
| 6286 | Project ID: 6286 DEA: 112T0894 | 11-SD-15-M43.9 | CONSTRUCT BARRIER TRANSFER MACHINE FACILITY | 12/23/2011 | 1 (01/19/2012) | Details CEM-3701 Report | |
| 6287 | Project ID: 6287 DEA: 112T0914 | 11-SD-15-R16.9/M24.1 | CONSTRUCT UNIT ONE OF THE MANAGED LANES, SOUTH SEGMENT | 05/31/2011 | 1 (05/22/2012) | Details CEM-3701 Report | |
| 6288 | Project ID: 6288 DEA: 112T0924 | 11-SD-15,163-R16.7/M34.1 | CONSTRUCT MANAGED LANES, SOUTH SEGMENT , UNIT 2 | 08/22/2012 | 1 (08/22/2012) | Details CEM-3701 Report | |
| 6289 | Project ID: 6289 DEA: 112T0934 | 11-SD-15-M25.7/M31.0 | CONSTRUCT MANAGED LANES SOUTH SEGMENT | 12/28/2011 | 1 (01/19/2012) | Details CEM-3701 Report | |
| 6293 | Project ID: 6293 DEA: 112T1204 EFIS: 1100000455 | 11-SD-15- | PROJECT BUS - RANCHO BERNARDO, SABRE SPRINGS AND DEL LAGO | 08/17/2021 | 2 (07/09/2021) | Details CEM-3701 Report | |
| 6295 | Project ID: 6295 DEA: 11323404 MINOR: 11A1445 | 11-IMP-7-.2 | MODIFY EXISTING TRUCK INSPECTIONS PIT COVERS | 1 (11/01/2010) | Details CEM-3701 Report | ||
| 6296 | Project ID: 6296 DEA: 11323404 MINOR: 11A1445 | 11-IMP-7-.2 | MODIFY EXISTING TRUCK INSPECTION PIT | 1 (11/01/2010) | Details CEM-3701 Report | ||
| 6297 | Project ID: 6297 DEA: 11341104 MINOR: 11A1257 | 11-SD-15-6.4/18.5 | REVISE OVERHEAD SIGNS | 1 (11/01/2010) | Details CEM-3701 Report | ||
| 6298 | Project ID: 6298 DEA: 11341104 | 11-SD-52,15-6.4/18.5 | REVISE OVERHEAD SIGN | 08/19/2021 | NOT VERIFIED | Details CEM-3701 Report |
