Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15121-15130 of 18855 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211375Project ID: 211375
DEA: 081E3004
EFIS: 0813000207
08-RIV-15-33.1/35.8INSTALL RAMP METERING SYSTEM AT NB & SB ENTRANCE RAMPSRIVERSIDE COUNTY NEAR CORONA FROM TEMESCAL CANYON ROAD TO WEIRICK ROAD10/16/20171 (10/26/2016)Details CEM-3701 Report
208732Project ID: 208732
DEA: 081C8304
EFIS: 0813000038
08-RIV-111-8.0/10.0COLD IN-PLACE RECYCLING AND COLD PLANE AND PAVE WITH HMA (TYPE C)RIVERSIDE COUNTY NEAR DESERT BEACH AND NORTH SHORE FROM 0.3 MILE NORTH OF PARKSIDE DRIVE TO 1.6 MILES SOUTH OF CLEVELAND STREET01/09/20141 (06/19/2013)Details CEM-3701 Report
1000027Project ID: 1000027
DEA: 081J7104
EFIS: 0818000098
08-RIV-10-R91.9STRUCTURE EXCAVATION, PARTIALLY GROUTED RSP, AND RHMA.RIVERSIDE COUNTY NEAR DESERT CENTER AT ORRIS DITCH BRIDGE06/09/20251 (01/18/2024)Details CEM-3701 Report
5008Project ID: 5008
DEA: 080K6814
08-RIV-10-94.7/99.0BRIDGE REHABILITATIONRIVERSIDE COUNTY NEAR DESERT CENTER AT VARIOUS LOCATIONS FROM 5.2 MILES EAST OF HAYFIELD ROAD TO 3.0 MILES WEST OF EAGLE MOUNTAIN ROAD06/08/20121 (06/08/2012)Details CEM-3701 Report
993649Project ID: 993649
DEA: 081M0304
EFIS: 0821000062
08-RIV-177-0.0/27.0PLACE RUBBERIZED HMA, TRAFFIC STRIPING & COLD PLANE ASPHALT CONCRETE.RIVERSIDE COUNTY NEAR DESERT CENTER FROM ROUTE 10/177 SEPARATION TO ROUTE 6203/27/20231 (07/27/2022)Details CEM-3701 Report
8128Project ID: 8128
DEA: 080N9104
EFIS: 0800001013
08-RIV-62-R0.4/R1.1INSTALL TRAFFIC SIGNAL AND REALIGN TWO LEFT TURN LANES.RIVERSIDE COUNTY NEAR DESERT HOT SPRINGS FROM 1.1 MILE NORTH TO 0.8 MILE SOUTH OF DILLON ROAD12/23/20131 (12/10/2012)Details CEM-3701 Report
208908Project ID: 208908
DEA: 08491804
EFIS: 0800020104
08-RIV-62-0.0/R6.7REHABILITATE ROADWAY PAVEMENT AND WIDEN MEDIAN SHOULDERSRIVERSIDE COUNTY NEAR DESERT HOT SPRINGS FROM ROUTE 10/62 SEPARATION TO NORTH INDIAN CANYON DRIVE10/08/20141 (10/01/2013)Details CEM-3701 Report
213808Project ID: 213808
DEA: 080N6704
EFIS: 0800000536
08-RIV-74-28.1/37.4CONSTRUCT RAISED MEDIAN AND LEFT TURN LANES.RIVERSIDE COUNTY NEAR HEMET FROM 0.6 MILE EAST OF ROUTE 215 TO 0.4 MILE WEST OF ACACIA AVENUE.04/28/20221 (12/04/2019)Details CEM-3701 Report
215803Project ID: 215803
DEA: 081J0204
EFIS: 0817000182
08-RIV-74-R48.8/49.2CONSTRUCT DRAINAGE SYSTEM WITH STRUCTURAL CONCRETE HEADWALL AND CSP.RIVERSIDE COUNTY NEAR HEMET FROM 0.7 MILE TO 1.1 MILES EAST OF BLACKBURN ROAD07/27/20231 (06/23/2021)Details CEM-3701 Report
208731Project ID: 208731
DEA: 081C4304
EFIS: 0812000312
08-RIV-74-63.0/67.5and80.3/R92.3OVERLAY HMA-A AND PERFORM DIGOUTRIVERSIDE COUNTY NEAR IDYLLWILD AND PALM DESERT FROM HURKEY CREEK BRIDGE TO 0.5 MILE WEST OF MORRIS RANCH ROAD AND FROM 0.2 MILE WEST OF PINYON DRIVE TO 1.4 MILES SOUTH OF CAHUILLA WAY03/07/20141 (04/16/2014)Details CEM-3701 Report