Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15071-15080 of 18855 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7109 | Project ID: 7109 DEA: 044G3004 EFIS: 0412000383 MINOR: 04A3989 | 04-SM-101-17.95 | Replace Fence and Repair Concrete Barrier Railing | At Millbrae Avenue Overcrossing | 08/31/2012 | 1 (08/31/2012) | Details CEM-3701 Report |
| 5778 | Project ID: 5778 DEA: 100S8204 | 10-AMA,STA,TUO-5,49,120-VAR | REPLACE FENCE AND RUSTIC RAILING | various | 11/23/2009 | 1 (12/07/2009) | Details CEM-3701 Report |
| 2782 | Project ID: 2782 DEA: 050P8304 EFIS: 0500000273 COOP: 051517 MINOR: 05A1278 | 05-SLO-1-44.9/47.8 | REPLACE FENCE IN | 03/20/2020 | 1 (11/08/2019) | Details CEM-3701 Report | |
| 2656 | Project ID: 2656 DEA: 050M1304 EFIS: 0500000162 MINOR: 05A1180 | 05-SLO-101-30.4/31.7 | REPLACE FENCE IN SAN LUIS OBISPO COUNTY NEAR SAN LUIS OBISPO FROM 0.7 MILE SOUTH TO 0.6 MILE NORTH OF RESERVOIR CANYON ROAD | 03/16/2020 | 1 (11/07/2019) | Details CEM-3701 Report | |
| 1000772 | Project ID: 1000772 DEA: 021K5604 EFIS: 0224000136 | 02-SHA-273-17.031 | Replace fence south and east sides; three rolling gates southern portion of east side with steel tube style fencing as is in place around other portion of the facility. | Caltrans District Office 1657 Riverside Drive. | 09/23/2025 | 1 (12/04/2024) | Details CEM-3701 Report |
| 213542 | Project ID: 213542 DEA: 024H8204 EFIS: 0219000008 | 02-SIS,SIS-5-R58.3/R67.7 | Replace fence wire, place erosion control, remove burned trees, repair damaged under-drain clean-outs, replace damaged drainage features | 08/25/2020 | 1 (01/08/2019) | Details CEM-3701 Report | |
| 209296 | Project ID: 209296 DEA: 034M8904 EFIS: 0313000084 | 03-NEV-80,89-13.2/15.0,R0.6/R1.1 | REPLACE FENCE. | NEVADA COUNTY IN AND NEAR TRUCKEE ON ROUTE 80 FROM DONNER PARK OVERCROSSING TO WEST TRUCKEE UNDERCROSSING AND ON ROUTE 89 FROM 0.5 MILE NORTH OF ROUTE 80/89 SEPARATION TO ALDER DRIVE | 10/01/2014 | 1 (02/14/2014) | Details CEM-3701 Report |
| 7054 | Project ID: 7054 DEA: 044S5504 EFIS: 0400001248 | 04-MRN-101-7.4 | REPLACE FILL WITH LIGHTWEIGHT EMBANKMENT MATERIAL (CELLULAR CONCRETE) | MARIN COUNTY IN CORTE MADERA AT TAMALPAIS DRIVE OVERCROSSING | 09/09/2012 | 1 (04/10/2012) | Details CEM-3701 Report |
| 7141 | Project ID: 7141 DEA: 041F7304 EFIS: 0412000403 | 04-CC-80- | replace finger joint assemblies on Carquinez bridge | 03/18/2025 | 1 (02/29/2012) | Details CEM-3701 Report | |
| 209220 | Project ID: 209220 DEA: 041J3304 EFIS: 0414000194 | 04-NAP-29-R6.99 | Replace finger joint on Napa River Bridge | Napa River Bridge | 06/08/2020 | 1 (12/05/2013) | Details CEM-3701 Report |
