Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15051-15060 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 6123 | Project ID: 6123 DEA: 11273704 EFIS: 1100000264 COOP: 114928 MINOR: 11A1513 | 11--- | 1 (11/01/2010) | Details CEM-3701 Report | |||
| 6124 | Project ID: 6124 DEA: 11274804 | 11-SD-905-002.9/005.7 | PAVEMENT REHABILITATION OF MAINLINE, SHOULDERS, AND RAMPS | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 6126 | Project ID: 6126 DEA: 11275004 | 11-IMP-115-R003.2/R021.2 | PAVEMENT REHABILITATION OF MAINLINE SHOULDERS AND RAMPS | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 6129 | Project ID: 6129 DEA: 11276204 | 11-SD-805-9.8/12.9 | INSTALL RAMP METERS , HIGHWAY PLANTING, IRRIGATION SYSTEMS | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 6132 | Project ID: 6132 DEA: 11276504 | 11-SD-78- 19.8/ 20.3 | INSTALL TRAFFIC SIGNAL | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 6133 | Project ID: 6133 DEA: 11276604 | 11-IMP-111-001.2/008.2 | OVERLAY PAVEMENT | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 6134 | Project ID: 6134 DEA: 11276614 | 11-IMP-111-R4.7/T8.2 | RUBERRIZED HOT MIX | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 6135 | Project ID: 6135 DEA: 11276904 | 11-SD-94- 39.0/ 65.4 | APPLY 20 MM ASPHALT RUBBER OPEN GRADED OVERLAY. | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report | |
| 6136 | Project ID: 6136 DEA: 11277004 | 11-SD-78-0.0/0.3 | ASPHALT RUBBER OPEN GRADED OVERLAY (WESTBOUND) | 08/02/2010 | NOT VERIFIED | Details CEM-3701 Report | |
| 6137 | Project ID: 6137 DEA: 11277014 | 11-SD-78-0.0/3.3 | RUBBERIZED HOT MIX ASPHALT W/ OVERLAY AND COLD PLANE | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
