Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 15021-15030 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7061 | Project ID: 7061 DEA: 080P6904 EFIS: 0800020017 | 08-RIV-10,78-Var | CLEAN AND TREAT EXISTING BRIDGE DECKS AND REPLACE JOINT SEALS | RIVERSIDE COUNTY NEAR BLYTHE AT VARIOUS LOCATIONS | 02/06/2013 | 1 (09/26/2012) | Details CEM-3701 Report |
| 5153 | Project ID: 5153 DEA: 080P7704 | 08-RIV-78-0.0/16.4 | PAVEMENT REHABILITATION | RIVERSIDE COUNTY NEAR BLYTHE FROM 0.1 MILE SOUTH OF COUNTY LINE TO 0.1 MILE NORTH OF HOBSON WAY | 01/31/2012 | 1 (01/05/2012) | Details CEM-3701 Report |
| 7079 | Project ID: 7079 DEA: 080P7904 EFIS: 0800020031 | 08-RIV-95-L0.0/36.2 | DIGOUTS, COLD PLANE, OVERLAY AND SLURRY SEAL | RIVERSIDE COUNTY NEAR BLYTHE FROM 0.2 MILE SOUTH OF ROUTE 10/95 SEPARATION TO 0.7 MILE SOUTH OF LYE ROAD | 12/02/2013 | 1 (03/12/2012) | Details CEM-3701 Report |
| 993627 | Project ID: 993627 DEA: 081M0204 EFIS: 0821000065 | 08-RIV-95-L0.0/36.2 | SLURRY SEAL AND PAINT TRAFFIC STRIPE (RECESSED) | RIVERSIDE COUNTY NEAR BLYTHE FROM 0.2 MILE SOUTH OF ROUTE 10/95 SEPARATION TO 0.7 MILE SOUTH OF LYE ROAD. | 08/16/2023 | 1 (07/21/2022) | Details CEM-3701 Report |
| 209952 | Project ID: 209952 DEA: 081C3704 EFIS: 0812000302 | 08-RIV-95-L0.0/36.2 | HMA OVERLAY, UPGRADE CURB RAMP, AND UPGRADE METAL BEAM GUARD RAILING | RIVERSIDE COUNTY NEAR BLYTHE FROM 0.2 MILES SOUTH OF ROUTE 10/95 SEPARATION TO 0.7 MILE SOUTH OF LYE ROAD | 04/11/2017 | 1 (10/19/2015) | Details CEM-3701 Report |
| 6845 | Project ID: 6845 DEA: 080E4104 EFIS: 0800000082 | 08-RIV-10-R24.0/R24.3 | WIDENING, REPAIR BRIDGE DECK AND UPGRADE BRIDGE RAILING. | RIVERSIDE COUNTY NEAR CABAZON FROM 4.8 MILES EAST OF MAIN STREET TO 1.0 MILE WEST OF 10/111 SEPARATION | 01/29/2015 | 1 (08/21/2012) | Details CEM-3701 Report |
| 212891 | Project ID: 212891 DEA: 081F8504 EFIS: 0815000062 | 08-RIV-371-60.2/67.7&72.8/77.1 | PLACE CENTERLINE AND SHOULDER RUMBLE STRIPS. | RIVERSIDE COUNTY NEAR CAHUILLA FROM WILSON VALLEY ROAD TO CARY ROAD AND FROM KIRBY ROAD TO ROUTE 74 | 06/23/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
| 1000368 | Project ID: 1000368 DEA: 081J4704 EFIS: 0818000055 | 08-RIV-10-R87.9,R91.0 | PARTIALLY GROUTED RSP, STRUCTURE EXCAVATION AND ROADWAY EXCAVATION. | RIVERSIDE COUNTY NEAR CHIRIACO SUMMIT AT THREE STAR DITCH BRIDGE AND AT DETERMINATION DITCH BRIDGE | 09/30/2025 | 1 (09/02/2024) | Details CEM-3701 Report |
| 7354 | Project ID: 7354 DEA: 080L9004 EFIS: 0800000444 | 08-RIV-70,162-71.8/R72.3 | UPGRADE WASTE WATER TREATMENT SYSTEM. | RIVERSIDE COUNTY NEAR COACHELLA ABOUT 12.9 MILES EAST OF DILLON ROAD UNDERCROSSING AT THE CACTUS CITY SAFETY ROADSIDE REST AREA | 12/07/2015 | 1 (05/21/2012) | Details CEM-3701 Report |
| 5105 | Project ID: 5105 DEA: 080M8104 | 08-RIV-86S-R4.4 | REPLACE BRIDGE DECK TREATMENT MATERIAL | RIVERSIDE COUNTY NEAR COACHELLA AT KINGS STORMWATER CHANNEL | 06/13/2011 | 1 (06/07/2010) | Details CEM-3701 Report |
