Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 15001-15010 of 18754 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
3820Project ID: 3820
DEA: 07127264
07-LA-138-61.5WIDEN HIGHWAY AND CONSTRUCT BRIDGEIN LOS ANGELES COUNTY ATPEARBLOSSOM AND LLANO FROM 2.1 KM EAST OF LONGVIEW ROAD TO 0.1 KM WEST OF 165TH STREET EAST07/29/20101 (07/29/2010)Details CEM-3701 Report
3819Project ID: 3819
DEA: 07127254
07-LA-138-60.2WIDENING AND ASPHALT CONCRETEIN LOS ANGELES COUNTY ATPEARLBLOSSOM FROM 0.2 KM WEST OFLONGVIEW ROAD TO 3.0 KM WEST OF 165TH STREET EAST07/29/20101 (07/29/2010)Details CEM-3701 Report
3818Project ID: 3818
DEA: 07127244
EFIS: 0700000130
07-LA-138-59.7/ 60.2WIDEN CONVENTIONAL HIGHWAY (SEG 9)  1 (07/11/2007)Details CEM-3701 Report
3817Project ID: 3817
DEA: 07127234
07-LA-138- 56.2/ 57.2WIDEN CONVENTIONAL HIGHWAY (SEG 7)07/29/20101 (07/29/2010)Details CEM-3701 Report
3816Project ID: 3816
DEA: 07127224
EFIS: 0700000128
07-LA-138-54.3/ 55.5WIDEN CONVENTIONAL HIGHWAY (SEG 5)LOS ANGELES COUNTY AT LITTLEROCK FROM 77TH STREET EAST TO 0.2 KM EAST OF 87TH STREET EAST06/26/20131 (08/24/2011)Details CEM-3701 Report
3815Project ID: 3815
DEA: 07127214
07-LA-138- 51.9/ 52.5WIDEN CONVENTIONAL HIGHWAY(SEG 2)07/29/20101 (07/29/2010)Details CEM-3701 Report
3814Project ID: 3814
DEA: 071264F4
07-LA-210-R 49.3PLANTING AND IRRIGATIONIN LOS ANGELES COUNTY IN CLAREMONTFROM THOMPSON CREEK BRIDGE TO SAN BERNARDINO COUNTY LINE07/29/20101 (07/29/2010)Details CEM-3701 Report
3813Project ID: 3813
DEA: 071257U4
07-LA-60-R 22.4CONCRETE BOX GIRDER BRIDGEIN LOS ANGELES COUNTY IN DIAMONDBAR AND THE CITY OF INDUSTRY AT VARIOUS LOCATIONS07/29/20101 (07/29/2010)Details CEM-3701 Report
3812Project ID: 3812
DEA: 07122004
07-LA-5-39.4WIDEN FREEWAY AND STRUCTURESIN LOS ANGELES COUNTY INLOS ANGELES FROM ROUTE 118 AND 5SEPARATION TO 0.7 KM SOUTH OF ROUTE 14 AND 5 CONNECTOR OVERHEAD07/29/20101 (07/29/2010)Details CEM-3701 Report
3811Project ID: 3811
DEA: 071219U4
EFIS: 0700001829
07-LA-5,170-58.0/63.4,R32.3/R33.1Construct HOV lanes, connectors and replace slabs.LOS ANGELES COUNTY IN LOS ANGELES ON ROUTE 5 FROM 0.1 KM NORTH OF SHELDON STREET OVERCROSSING TO ROUTE 5/118 SEPARATION AND ON ROUTE 170 FROM 0.1 KM SOUTH OF ARLETA/SHELDON UNDERCROSSING TO ROUTE 5/170 SEPARATION08/25/20161 (08/16/2012)Details CEM-3701 Report