Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14951-14960 of 17350 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
1376 | Project ID: 1376 DEA: 04044634 EFIS: 0400000054 | 04-ALA-80-8.8/8.9,0.0/0.7 | REPAIR BRIDGE JOINT SEALS | SAN FRANCISCO AND ALAMEDA COUNTIES AT SAN FRANCISCO-OAKLAND BAY BRIDGE EAST OF YERBA BUENA ISLAND | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
1625 | Project ID: 1625 DEA: 040A8714 | 04-SF,SM-1,35,82,92,101-Var | GUARDRAIL END TERMINAL TO BE UPGRADED | SAN FRANCISCO AND SAN MATEO COUNTIES AT VARIOUS LOCATIONS | 08/24/2011 | 1 (08/24/2011) | Details CEM-3701 Report |
10008 | Project ID: 10008 DEA: 042E7604 EFIS: 0400021124 | 04-SF,SM-1,280-VAR | TREAT BRIDGE DECK WITH METHACRYLATE AND REPLACE JOINT SEAL. | SAN FRANCISCO AND SAN MATEO COUNTIES AT VARIOUS LOCATIONS | 05/09/2014 | 1 (05/01/2013) | Details CEM-3701 Report |
211445 | Project ID: 211445 DEA: 042J2604 EFIS: 0414000469 | 04-SF,SM-101,280-var | TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS. | SAN FRANCISCO AND SAN MATEO COUNTIES AT VARIOUS LOCATIONS | 03/09/2018 | 1 (07/06/2016) | Details CEM-3701 Report |
8172 | Project ID: 8172 DEA: 044H0704 EFIS: 0413000143 | 04-SF-80- | Replace one precast concrete barrier. | San Francisco I-80 | 1 (12/13/2012) | Details CEM-3701 Report | |
213017 | Project ID: 213017 DEA: 041K9904 EFIS: 0416000339 COOP: TBD | 04-SF-101,92,84- | (Alternative Delivery)CALTRAIN PENINSULA CORRIDOR ELECTRIFICATION PROJECT, a Design Build Project. Install bridge screening and OCS attachments on approximately 40 Caltrans structures that cross the rail line in the San Francisco peninsula. | San Francisco peninsula at various structures along rail line, to include 101, 280, 380, 92, 85, 237, and 880. | 2 (02/06/2018) | Details CEM-3701 Report | |
6928 | Project ID: 6928 DEA: 041637U3 EFIS: 0400020166 | 04-SF-101-8.2/9.8, 6.9/7.1 | P3 project, Doyle Drive Phase 2, Remaining elements of Presidio Parkway, including NB Presidio Viaduct and Battery Tunnel, Main Post Tunnels, and new Girard Road Interchange w/direct connection to the Presidio. | San Francisco Presidio, Southern approach to Golden Gate Bridge | 07/12/2019 | 2 (02/07/2013) | Details CEM-3701 Report |
1714 | Project ID: 1714 DEA: 040F7404 EFIS: 0400000261 MINOR: 04A3415 | 04-SF-5701- | Install Ethanol Fueling Facility | San Francisco Specialty Region Fuel Station | 1 (11/04/2019) | Details CEM-3701 Report | |
1699 | Project ID: 1699 DEA: 040E9604 | 04-SF,SM,SCL-101,280,880-VAR | REPLACE DECK DRAINAGE SYSTEM AND TREAT BRIDGE DECK WITH METHACRYLATE. | SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS | 08/25/2011 | 1 (07/13/2010) | Details CEM-3701 Report |
8237 | Project ID: 8237 Permit Numbers: 0710NSN2225 | 07-LA-210-28.462/28.462 | Install Pedestrian Pushbutton Posts and Foundations. Install conduit where needed. | SAN GABRIEL BLVD., PASADENA | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |