Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14681-14690 of 19138 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993180 | Project ID: 993180 Permit Numbers: 04216MC1118 | 04-SCL-9-9.6 | Removal and replacement of portions of existing curb and gutter, and roadway.We wish to reopen this encroachment permit to complete the relocation of the existing Beacon Light and pavement striping.Previously approved work was incomplete due to construction delays. No modifications have been made t | 18840 Los Gatos-Saratoga Road, Monte Sereno | NOT VERIFIED | Details CEM-3701 Report | |
| 993181 | Project ID: 993181 DEA: 031H5904 EFIS: 0316000187 | 03-BUT-99- | Eaton Rd I/C Roundabout | 1 (08/20/2021) | Details CEM-3701 Report | ||
| 993182 | Project ID: 993182 DEA: 024F5204 EFIS: 0213000002 | 02-SIS-5-R9.9/R68.1 | ROADWAY EX, HYDRAULIC BIOTIC GROWTH MED. AND MIDWEST GUARDRAIL SYSTEM. | SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM 0.2 MILE NORTH OF REAM AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF HILT ROAD OVERCROSSING | 10/06/2022 | 1 (08/23/2021) | Details CEM-3701 Report |
| 993183 | Project ID: 993183 DEA: 031H2704 EFIS: 0316000082 | 03-YUB-70-R11.2/13.5 | UPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER. | YUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD | 1 (08/16/2021) | Details CEM-3701 Report | |
| 993184 | Project ID: 993184 DEA: 040A7724 EFIS: 0420000288 COOP: 0422825 | 04-ALA-80-6.4/6.8 | Excavation, HMA, structural concrete, minor concrete and drainage. | IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD | 1 (04/08/2022) | Details CEM-3701 Report | |
| 993185 | Project ID: 993185 DEA: 043W3904 EFIS: 0421000352 | 04-MRN,MARIN-101-3.54/4.7 | 03/13/2023 | 1 (08/09/2021) | Details CEM-3701 Report | ||
| 993186 | Project ID: 993186 DEA: 04264704 EFIS: 0400000740 | 04-SCL-101-40.0/41.5 | Reconstruction of the existing three-quadrant cloverleaf interchange to a Type L-9 partial cloverleaf interchange | The Project limits are on Route US 101 at De La Cruz Blvd/Trimble Road Interchange in San Jose at Santa Clara County | 2 (08/09/2021) | Details CEM-3701 Report | |
| 993187 | Project ID: 993187 DEA: 024H9004 EFIS: 0219000022 MINOR: 02A1950 | 02-PLU-70-80.4/80.8 | Light Poles | 05/14/2024 | 1 (08/23/2021) | Details CEM-3701 Report | |
| 993188 | Project ID: 993188 DEA: 040W9904 EFIS: 0420000321 MINOR: 04A6110 | 04-MRN-131-2.7 | Install Pedestrian Hybrid Beacons | Marin County | 1 (08/11/2021) | Details CEM-3701 Report | |
| 993190 | Project ID: 993190 DEA: 081C0834 EFIS: 0816000090 | 08-RIV-10-R134.0/R156.5 | Riv 10 Blythe Pavement Rehab: mainline, shoulders, ramps | 01/16/2026 | 1 (08/31/2021) | Details CEM-3701 Report |
