Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14651-14660 of 18774 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000175 | Project ID: 1000175 DEA: 032G8104 EFIS: 0322000165 | 03-PLA-80,174-VAR | PLACE POLYESTER CONCRETE OVERLAY. | PLACER COUNTY AT VARIOUS LOCATIONS | 03/20/2025 | 1 (04/18/2024) | Details CEM-3701 Report |
| 1001094 | Project ID: 1001094 DEA: 033G4904 EFIS: 0324000160 | 03-PLA-28,89,267-Var | MODIFY CMS. | PLACER COUNTY AT VARIOUS LOCATIONS | 1 (03/24/2025) | Details CEM-3701 Report | |
| 215338 | Project ID: 215338 DEA: 030H7204 EFIS: 0316000008 | 03-PLA-80-1.3/R63.5 | REPLACE GUARDRAIL AND VEGETATION CONTROL (MINOR CONCRETE). | PLACER COUNTY AT VARIOUS LOCATIONS FROM 0.7 MILE WEST OF DOUGLAS BOULEVARD TO CISCO OVERCROSSING | 06/27/2022 | 1 (12/11/2020) | Details CEM-3701 Report |
| 1022 | Project ID: 1022 DEA: 032E8804 | 03-PLA-65-VAR | BRIDGE DECKS CLEANED AND TREATED WITH METHACRYLATAE DECK SEAL | Placer County at various locations from Blue Oaks Blvd. Overcrossing to Ingram Slough Bridge. | 12/29/2009 | 1 (12/29/2009) | Details CEM-3701 Report |
| 214836 | Project ID: 214836 DEA: 030G9804 EFIS: 0317000313 | 03-PLA-80-46.3/53.4 | CONCRETE SLAB REPLACEMENT. | PLACER COUNTY FR0M CRYSTAL SPRINGS ROAD OVERCROSSING TO BLUE CANYON ROAD UNDERCROSSING | 07/23/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
| 1000435 | Project ID: 1000435 DEA: 030J01U4 EFIS: 0323000244 | 03-PLA-28-0.1/11.0 | HMA (TYPE A), COLD PLANE AC PVMT, RDWY EXC, & CL 2 AB. | PLACER COUNTY FROM 0.1 MILE EAST OF ROUTE 89 AT TAHOE CITY TO THE NEVADA STATE LINE AT KINGS BEACH | 1 (07/30/2024) | Details CEM-3701 Report | |
| 849 | Project ID: 849 DEA: 030E9904 | 03-PLA-267-4.9/6.7 | PLACE RSP, HMA (TYPE A) AND HMA DIKE. | PLACER COUNTY FROM 1.1 MILES EAST OF NORTH STAR DRIVE TO 0.5 MILE SOUTH OF MARTIS PEAK ROAD. | 07/20/2012 | 1 (10/11/2010) | Details CEM-3701 Report |
| 214837 | Project ID: 214837 DEA: 031E0504 EFIS: 0300020600 | 03-PLA-80-31.5/36.9 | REPLACE CULVERT AND DRAINAGE SYSTEM. | PLACER COUNTY FROM WEST OF ILLINOIS TOWN OVERCROSSING TO EAST OF CAPE HORN UNDERCROSSING | 09/27/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
| 213762 | Project ID: 213762 DEA: 032F3404 EFIS: 0300020616 | 03-PLA-49-3.1/7.5 | WIDEN SHOULDERS, ADD RETAINING WALLS, REPLACE MBGR, CURBS & ELECTRICAL | PLACER COUNTY IN AND NEAR AUBURN FROM 0.1 MILE SOUTH OF ROUTE 49/80 SEPARATION TO 0.1 MILE NORTH OF DRY CREEK ROAD | 05/11/2022 | 1 (01/08/2019) | Details CEM-3701 Report |
| 7099 | Project ID: 7099 DEA: 033M9304 EFIS: 0300020534 | 03-PLA-49-3.1/7.5 | REPLACE AC SURFACING | PLACER COUNTY IN AND NEAR AUBURN FROM 0.1 MILE SOUTH OF ROUTE 80/49 SEPARATION TO WISE CANAL BRIDGE AND FROM 0.1 MILE NORTH OF WILLOW CREEK DRIVE TO 0.1 MILE NORTH OF DRY CREEK ROAD | 10/01/2012 | 1 (06/07/2012) | Details CEM-3701 Report |
