Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 14621-14630 of 18758 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210796Project ID: 210796
DEA: 024G8204
EFIS: 0214000063
02-SIS-5-R10.7/R19.5COLD PLANE, PLACE HMA 04/06/20181 (09/23/2015)Details CEM-3701 Report
1024Project ID: 1024
DEA: 032E9004
03-NEV,SAC,SUT-49,51,99-VARCOLD PLANE, PLACE 03/22/20111 (03/22/2011)Details CEM-3701 Report
211496Project ID: 211496
DEA: 060S4804
EFIS: 0615000049
06-TUL-65-R9.3/14.0COLD PLANE, PAVE WITH RHMA-G AND MODIFY SIGNAL AND LIGHTING.TULARE COUNTY IN AND NEAR TERRA BELLA FROM 0.7 MILE SOUTH OF AVENUE 80 TO 0.1 MILE SOUTH OF AVENUE 11208/20/20181 (10/04/2016)Details CEM-3701 Report
215593Project ID: 215593
DEA: 112N0954
EFIS: 1120000251
11-SD-8-R25.9/R32.0COLD PLANE, PAVE WITH RHMA, APPLY MICROSURFACING AND TRAFFIC STRIPE.SAN DIEGO COUNTY NEAR ALPINE FROM 0.2 MILE EAST OF HARBISON CANYON ROAD UNDERCROSSING TO 0.4 MILE EAST OF VIEJAS CREEK BRIDGE.09/14/20231 (07/06/2021)Details CEM-3701 Report
215590Project ID: 215590
DEA: 112N0414
EFIS: 1118000184
11-IMP-115-R8.8/L11.4COLD PLANE, PAVE WITH HMA, PLACE MICROSURFACING AND SHOULDER BACKING.IMPERIAL COUNTY IN AND NEAR HOLTVILLE FROM TOWLAND ROAD TO WEST JUNCTION EVAN HEWES HIGHWAY.05/10/20221 (07/23/2021)Details CEM-3701 Report
8222Project ID: 8222
DEA: 080P3804
EFIS: 0800001024
08-SBD-83,210-R0.0/7.2,R30.2/R33.2COLD PLANE, OVERLAY, REPLACE AC SUFACING AND PLACE MICRO-SURFACESAN BERNARDINO COUNTY IN CHINO, ONTARIO, HIGHLAND AND REDLANDS ON ROUTE 83 FROM ROUTE 71/83 SEPARATION TO ROUTE 60/83 SEPARATION AND ON ROUTE 210 FROM FIFTH STREET OVERCROSSING TO ROUTE 10/210 SEPARATION.11/27/20131 (07/24/2013)Details CEM-3701 Report
1000602Project ID: 1000602
DEA: 040K6404
EFIS: 0416000112
04-SOL-80-15.9/30.2COLD PLANE, OVERLAY, MGS, RAMP METERING, LIGHTING AND SIGNAL.SOLANO COUNTY ON ROUTE 80 IN AND NEAR FAIRFIELD AND VACAVILLE AT VARIOUS LOCATIONS FROM 1.5 MILES EAST OF SUISUN VALLEY ROAD OVERCROSSING TO 0.8 MILE EAST OF LEISURE TOWN ROAD OVERCROSSING. 1 (10/07/2024)Details CEM-3701 Report
209252Project ID: 209252
DEA: 080G6204
EFIS: 0800000218
08-SBD-38-15.0/49.5COLD PLANE, OVERLAY, CENTERLINE RUMBLE STRIPS AND MIDWEST GUARDRAILSAN BERNARDINO COUNTY NEAR ANGELUS OAKS FROM VALLEY OF THE FALLS DRIVE TO NORTH JUNCTION OF ROUTE 18 NEAR BIG BEAR LAKE05/16/20161 (04/16/2014)Details CEM-3701 Report
995232Project ID: 995232
DEA: 120U1704
EFIS: 1223000051
12-ORA-133,261-9.8/12.6,0.0/3.5COLD PLANE, OVERLAY, AND REFRESH PAVEMENT DELINEATION.ORANGE COUNTY IN IRVINE ON ROUTE 133 FROM TECHNOLOGY DRIVE UNDERCROSSING TO PORTOLA PARKWAY UNDERCROSSING AND ON ROUTE 261 FROM WALNUT AVENUE OVERCROSSING TO 0.6 MILE NORTH OF PORTOLA PARKWAY OVERCROSSING09/20/20241 (10/16/2023)Details CEM-3701 Report
212911Project ID: 212911
DEA: 081F9404
EFIS: 0815000067
08-RIV-79-R4.7/R10.6COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (TYPE G)RIVERSIDE COUNTY FROM 0.1 MILE SOUTH OF MURRIETA HOT SPRINGS ROAD TO 0.1MILE NORTH OF ABELIA ROAD06/23/20211 (12/28/2018)Details CEM-3701 Report