Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14441-14450 of 17330 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
994821 | Project ID: 994821 DEA: 080J2404 EFIS: 0822000124 | 08-SBD-142-3.5/R3.9 | HMA (TYPE A), RUBBERIZED HMA (GAP GRADED), CL 2 AB, RDWY EXCAVATION. | SAN BERNARDINO COUNTY IN CHINO HILLS FROM 0.5 MILE NORTH OF FELDSPAR DRIVE TO CHINO HILLS PARKWAY | 02/23/2024 | 1 (08/02/2023) | Details CEM-3701 Report |
8222 | Project ID: 8222 DEA: 080P3804 EFIS: 0800001024 | 08-SBD-83,210-R0.0/7.2,R30.2/R33.2 | COLD PLANE, OVERLAY, REPLACE AC SUFACING AND PLACE MICRO-SURFACE | SAN BERNARDINO COUNTY IN CHINO, ONTARIO, HIGHLAND AND REDLANDS ON ROUTE 83 FROM ROUTE 71/83 SEPARATION TO ROUTE 60/83 SEPARATION AND ON ROUTE 210 FROM FIFTH STREET OVERCROSSING TO ROUTE 10/210 SEPARATION. | 11/27/2013 | 1 (07/24/2013) | Details CEM-3701 Report |
994945 | Project ID: 994945 DEA: 081J6304 EFIS: 0818000086 | 08-SBD-215-3.6/6.0 | INDIVIDUAL SLAB REPLACEMENT (RSC) AND RHMA. | SAN BERNARDINO COUNTY IN COLTON AND SAN BERNARDINO FROM 0.2 MILE SOUTH OF ROUTE 10/215 SEPARATION TO MILL STREET UNDERCROSSING | 1 (08/15/2023) | Details CEM-3701 Report | |
994145 | Project ID: 994145 DEA: 081G2804 EFIS: 0815000192 | 08-SBD-10-R22.4 | CLEAN AND PAINT STRUCTURAL STEEL, SLOPE PAVING AND STRUCTURAL CONC. | SAN BERNARDINO COUNTY IN COLTON AT COLTON OVERHEAD BRIDGE | 1 (08/02/2023) | Details CEM-3701 Report | |
213747 | Project ID: 213747 DEA: 080Q9104 EFIS: 0800020580 | 08-SBD-10-R23.8 | RETROFIT BRIDGE PIER WALLS, FOOTINGS AND POLYESTER CONCRETE OVERLAY. | SAN BERNARDINO COUNTY IN COLTON AT THE SANTA ANA RIVER BRIDGES | 07/27/2022 | 1 (03/18/2019) | Details CEM-3701 Report |
214663 | Project ID: 214663 DEA: 081F7304 EFIS: 0815000034 | 08-SBD-215-2.7 | REPLACE CONCRETE BRIDGE, PLACE CONCRETE PCPS GIRDERS AND HMA. | SAN BERNARDINO COUNTY IN COLTON AT WASHINGTON STREET OVERCROSSING | 1 (02/24/2021) | Details CEM-3701 Report | |
213607 | Project ID: 213607 DEA: 081F44U4 EFIS: 0817000060 | 08-SBD-10-R21.60/R23.6 | INSTALL GORE PAVING, UPGRADE IRRIGATION FACILITIES | SAN BERNARDINO COUNTY IN COLTON FROM 0.4 MILE WEST OF RANCHO AVENUE OVERCROSSING TO 0.3 MILE EAST OF MOUNT VERNON AVENUE OVERCROSSING. | 11/01/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
5089 | Project ID: 5089 DEA: 080M3504 | 08-SBD-10-20.0/R24.5 | GRIND PCC PAVEMENT AND RECONSTRUCT GUARD RAILING. | SAN BERNARDINO COUNTY IN COLTON FROM RIVERSIDE AVENUE OVERCROSSING TO 0.3 MILE EAST OF 10/215 SEPARATION | 10/16/2012 | 1 (10/16/2012) | Details CEM-3701 Report |
213970 | Project ID: 213970 DEA: 080K1214 EFIS: 0815000245 | 08-SBD-15-12.5/14.8 | REPLACE PCC PAVEMENT WITH JPCP AND PRECAST JOINTED CONCRETE PAVEMENT. | SAN BERNARDINO COUNTY IN FONTANA AND NEAR DEVORE FROM 0.3 MILE SOUTH OF SIERRA AVENUE UNDERCROSSING TO GLEN HELEN PARKWAY UNDERCROSSING | 01/18/2022 | 1 (12/12/2019) | Details CEM-3701 Report |
5325 | Project ID: 5325 DEA: 08497504 | 08-SBD-10-12.0/19.8 | CONSTRUCT LANES, SHOULDERS AND WIDEN EXIT RAMPS | SAN BERNARDINO COUNTY IN FONTANA AND RIALTO FROM 0.4 MILE EAST OF ETIWANDA AVENUE OVERCROSSING TO 0.2 MILE WEST OF RIVERSIDE AVENUE OVERCROSSING | 02/06/2013 | 1 (06/21/2010) | Details CEM-3701 Report |