Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
995328 | Project ID: 995328 DEA: 051Q8204 EFIS: 0523000077 | 05-SLO/SLO-1-35.8/35.8 | Repair slipout and partial washout, clear debris, place RSP, repair damaged culverts/drainage facilities, HMA and Dike Repairs/restoration, repair slipouts, landslides, and clear debris, restore roadway facility, place erosion control, temporary traffic control | 11/25/2024 | 1 (10/10/2024) | Details CEM-3701 Report | |
995329 | Project ID: 995329 DEA: 101R3504 EFIS: 1023000134 | 10-SJ/STA-120-6/6.9 | Provide necessary traffic control and traffic control devices, remove all loose material from the damaged embankments and backfill with suitable material, remove and replace the damaged overside drains, place permanent erosion control on all disturbed soil, replace the damaged structural section, re | NOT VERIFIED | Details CEM-3701 Report | ||
995330 | Project ID: 995330 DEA: 081N9304 EFIS: 0823000067 | 08-SBD-18-R11.3/19.1 | Replace rock netting and scale slopes. | 08/01/2024 | 1 (12/18/2023) | Details CEM-3701 Report | |
995331 | Project ID: 995331 DEA: 101R2404 EFIS: 1023000121 | 10-TUO-120-48.7/49.5 | Remove unsuitable material, repair/replace drainage systems, place embankment fill, and replace structural section. | 1 (11/16/2023) | Details CEM-3701 Report | ||
995332 | Project ID: 995332 DEA: 101R3904 EFIS: 1023000139 | 10-SAN JOAQUIN-5-VAR/VAR | Repair spalled pavement on bridge decks and approach slabs. | 03/06/2024 | NOT VERIFIED | Details CEM-3701 Report | |
995333 | Project ID: 995333 DEA: 120U4104 EFIS: 1223000084 | 12-ORA-91-15.63/15.63 | MSE Wall Panel Repairs | 1 (11/21/2023) | Details CEM-3701 Report | ||
995334 | Project ID: 995334 DEA: 072XE104 EFIS: 0723000091 | 07-VEN-126-9.77/24.61 | Clear debris from mudslides, clean clogged drainage systems, clean the filled v-ditches, repair or remove and replace the damaged drainage systems, repair the eroded slopes, place erosion control | 1 (11/27/2023) | Details CEM-3701 Report | ||
995335 | Project ID: 995335 DEA: 034J1604 EFIS: 0323000125 | 03-ED-Var-VAR/VAR | Site preparation, debris removal, excavation, replace/repair culverts, backfill, paving, erosion control, earthwork, traffic control, incidental work | 05/09/2024 | 1 (11/13/2023) | Details CEM-3701 Report | |
995336 | Project ID: 995336 DEA: 072XE004 EFIS: 0723000090 | 07-LA-1-40.07/40.55 | Stabilize and reconstruct the side slope using native material, place geofabric against the side slope and on the base of the RSP, reconstruct the RSP with various sized rocks, remove and replace the damaged drainage pipes, replace the Hot Mix Asphalt (HMA) shoulder, replace the HMA Dike, cold plane | 1 (01/22/2024) | Details CEM-3701 Report | ||
995337 | Project ID: 995337 DEA: 042Y9604 EFIS: 0423000183 | 04-ALA-24-R5.885/R5.885 | Clear debris/mud out of drainage basin, corrugated down drain pipe and drainage inlets, repair the corrugated down drain pipe, implement erosion control, install downslope berm, repair culvert, repair the PCC dike located above the hillside, install GMP inlet and riser on top of the hillside, instal | 1 (11/27/2023) | Details CEM-3701 Report |