Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14201-14210 of 18758 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994249 | Project ID: 994249 DEA: 061C7404 EFIS: 0621000147 | 06-FRE-180-R58.8 | CONSTRUCT CONCRETE BARRIER AND MODIFY RAMP METERING SYSTEM. | FRESNO COUNTY IN FRESNO AT ROUTE 41/180 CONNECTOR | 05/22/2023 | 1 (09/14/2022) | Details CEM-3701 Report |
| 210831 | Project ID: 210831 DEA: 09356904 EFIS: 0912000064 | 09-INY,MNO-6,108,136,158,168,182,395-var | CONSTRUCT CONCRETE BARRIER AND MIDWEST GUARDRAIL SYSTEM. | IN INYO AND MONO COUNTIES ATVARIOUS LOCATIONS | 07/27/2023 | 1 (10/19/2015) | Details CEM-3701 Report |
| 210559 | Project ID: 210559 DEA: 060N1804 EFIS: 0600020552 | 06-KIN-8,15,163-R8.8/R10.6 | CONSTRUCT CONCRETE BARRIER AND INSTALL NEW DRAINAGE SYSTEM. | KINGS COUNTY IN LEMOORE FROM ROUTE 41/198 SEPARATION TO 18TH AVENUE OVERCROSSING | 02/21/2017 | 1 (07/21/2015) | Details CEM-3701 Report |
| 1000539 | Project ID: 1000539 DEA: 044K3004 EFIS: 0417000293 | 04-SOL-80-22.1/R23.0 | CONSTRUCT CONCRETE BARRIER AND INSTALL DRAINAGE SYSTEM. | SOLANO COUNTY FROM 1.2 MILES EAST OF NORTH TEXAS STREET OVERCROSSING IN FAIRFIELD TO 0.1 MILE WEST OF CHERRY GLEN ROAD OVERCROSSING IN VACAVILLE | 1 (08/29/2024) | Details CEM-3701 Report | |
| 1001035 | Project ID: 1001035 DEA: 120U9104 EFIS: 1224000049 | 12-ORA-73-23.5/23.8 | CONSTRUCT CONCRETE BARRIER AND INSTALL DRAINAGE SYSTEM. | ORANGE COUNTY IN IRVINE FROM BISON AVENUE OVERCROSSING TO MACARTHUR BOULEVARD OVERCROSSING | 1 (05/27/2025) | Details CEM-3701 Report | |
| 210105 | Project ID: 210105 DEA: 09359704 EFIS: 0913000031 | 09-MNO-87,101-46.2,96.0 | CONSTRUCT CONCRETE BARRIER AND GUARDRAIL. | MONO COUNTY NEAR LEE VINING AT RUSH CREEK BRIDGE AND NEAR SONORA JUNCTION AT WEST WALKER RIVER BRIDGE | 07/07/2015 | 1 (04/28/2015) | Details CEM-3701 Report |
| 3132 | Project ID: 3132 DEA: 060F2004 | 06-FRE-180-R60.2/T60.4 | CONSTRUCT CONCRETE BARRIER (TYPE 60) | 04/21/2011 | 1 (03/25/2009) | Details CEM-3701 Report | |
| 4820 | Project ID: 4820 DEA: 080C1804 | 08-SBd-215-4.3/8.1 | CONSTRUCT CONCRETE BARRIER (MEDIAN) | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report | |
| 2366 | Project ID: 2366 DEA: 044A4604 EFIS: 0400001136 | 04-SOL-80-4.6/5.2 | CONSTRUCT CONCRETE BARRIER | SOLANO COUNTY IN VALLEJO FROM REDWOOD STREET ON-RAMP TO ROUTE 37 CONNECTOR | 01/17/2014 | 1 (09/20/2012) | Details CEM-3701 Report |
| 3270 | Project ID: 3270 DEA: 060J8404 | 06-FRE-180-R58.0/R58.6 | Construct Concrete Barrier | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
