Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14141-14150 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4045 | Project ID: 4045 DEA: 07253404 | 07-LA-27-3.0 | CONSTRUCT CONCRETE SLAB AND BARRIER AND RECONSTRUCT MBGR | 08/19/2010 | 1 (08/18/2010) | Details CEM-3701 Report | |
| 212692 | Project ID: 212692 DEA: 09352104 EFIS: 0900020090 | 09-INY-168,395-17.5/18.3,114.9/116.4 | CONSTRUCT CONCRETE SIDEWALKS, CURB RAMPS AND DRIVEWAYS. | INYO COUNTY IN BISHOP ON ROUTE 168 FROM 0.1 MILE WEST OF PIONEER LANE TO ROUTE 395 AND ON ROUTE 395 FROM 0.1 MILE SOUTH OF JAY STREET TO 0.4 MILE NORTH OF MAC IVER STREET | 06/23/2021 | 1 (05/03/2018) | Details CEM-3701 Report |
| 257 | Project ID: 257 DEA: 01480804 | 01-DN,HUM-101,299-VAR | CONSTRUCT CONCRETE RUSTIC RAIL AND POST FENCE | 12/23/2010 | 1 (11/13/2008) | Details CEM-3701 Report | |
| 209732 | Project ID: 209732 DEA: 072881U4 EFIS: 0714000085 | 07-LA-210-R16.1/R25.8 | CONSTRUCT CONCRETE PAVEMENT, PRECAST CONCRETE PANELS, AND SLABS. | LOS ANGELES COUNTY IN LA CANADA FLINTRIDGE, GLENDALE AND PASADENA FROM DUNSMORE AVENUE UNDERCROSSING TO NORTH LOS ROBLES AVENUE OVERCROSSING | 02/18/2020 | 1 (11/04/2014) | Details CEM-3701 Report |
| 211552 | Project ID: 211552 DEA: 041A2004 EFIS: 0413000124 | 04-SCL-152-R26.9 | CONSTRUCT CONCRETE PAVEMENT AND HIGH SPEED WEIGH-IN-MOTION SYSTEM | SANTA CLARA COUNTY ABOUT 17 MILES EAST OF GILROY AT 0.2 MILE EAST OF PACHECO CREEK BRIDGE | 12/21/2017 | 1 (10/14/2016) | Details CEM-3701 Report |
| 209234 | Project ID: 209234 DEA: 060P3704 EFIS: 0612000150 MINOR: 06A1920 | 06-KER-223-16.0 | Construct concrete pavement | In Kern County near Arvin on Rte 184 | 12/14/2020 | 1 (12/22/2014) | Details CEM-3701 Report |
| 2829 | Project ID: 2829 DEA: 050Q9604 EFIS: 0500000342 | 05-MON-68-R4.1/R4.5,15.2/15.8 | CONSTRUCT CONCRETE MEDIAN BARRIER. | MONTEREY COUNTY IN MONTEREY FROM 0.1 MILE TO 0.5 MILE EAST OF FAIRGROUND ROAD OVERCROSSING AND NEAR SALINAS FROM 0.5 MILE WEST OF TORO PARK UNDERCROSSING TO TORO PARK UNDERCROSSING | 01/17/2014 | 1 (03/28/2011) | Details CEM-3701 Report |
| 2817 | Project ID: 2817 DEA: 050Q6504 | 05-SB-101-82.2/84.3 | Construct concrete median barrier, widen shoulders and rumble strip. | SANTA BARBARA COUNTY NEAR SANTA MARIA FROM CLARK AVE OVERCROSSING TO SOUTH SANTA MARIA UNDERCROSSING. | 09/06/2011 | 1 (01/06/2012) | Details CEM-3701 Report |
| 2818 | Project ID: 2818 DEA: 050Q6604 | 05-SB-135-R10.4/11.7 | Construct Concrete Median Barrier, Widen Shoulders And Modify Signal. | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report | |
| 211747 | Project ID: 211747 DEA: 060R0504 EFIS: 0614000001 | 06-TUL-198-R4.2/R4.9,6.8/R8.3 | CONSTRUCT CONCRETE MEDIAN BARRIER, GUARDRAIL AND MESSAGE SIGN. | TULARE COUNTY IN VISALIA FROM 0.6 MILE WEST OF ROAD 80 OVERCROSSING TO ROAD 80 OVERCROSSING AND FROM AKERS STREET UNDERCROSSING TO 0.2 MILE EAST OF COUNTY CENTER DRIVE OVERCROSSING | 08/28/2018 | 1 (10/04/2016) | Details CEM-3701 Report |
