Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 14001-14010 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7536 | Project ID: 7536 DEA: 050T5304 EFIS: 0500000856 MINOR: 05A1542 | 05-MON-1-73.8 | Emergency Project to construct ADA Compliant Curb Ramps, Pathways and Pedestrian Refuge Areas | Monterey County | 03/20/2020 | 1 (11/11/2019) | Details CEM-3701 Report |
| 213262 | Project ID: 213262 Permit Numbers: 05186DP0692 | 05--1-75.7 | English Avenue Improvements | Monterey County | 11/30/00-1 | 1 (09/30/2019) | Details CEM-3701 Report |
| 213559 | Project ID: 213559 DEA: 051E0514 EFIS: 0515000079 MINOR: 05A2069 | 05-MON-101-53.2 | Landscape for Safety facility upgrades near Greenfield. Roadside cleaning, irrigation, planting, and plant establishment,- Greenfield CURE Replacement Planting | Monterey County | 1 (09/30/2019) | Details CEM-3701 Report | |
| 7040 | Project ID: 7040 DEA: 050R8104 EFIS: 0500000380 | 05-MON-1-0.3 | INSTALL PIPE CULVERT AND ROCK SLOPE PROTECTION. | MONTEREY COUNTY ABOUT 10.0 MILES SOUTH OF GORDA AT PEPPERWOOD GULCH | 07/23/2013 | 1 (03/20/2012) | Details CEM-3701 Report |
| 215709 | Project ID: 215709 DEA: 051H4604 EFIS: 0516000077 | 05-MON-1-63.0 | REHAB BRIDGE STRUCTURE AND ELECTROCHEMICAL CHLORIDE EXTRACTION. | MONTEREY COUNTY ABOUT 11.3 MILES SOUTH OF CARMEL AT GARRAPATA CREEK BRIDGE | 12/14/2023 | 1 (05/12/2021) | Details CEM-3701 Report |
| 213578 | Project ID: 213578 DEA: 051A0004 EFIS: 0500020284 | 05-MON-1-58.3/59.8 | WIDEN SHOULDERS OF EXISTING ROADBED AND UPGRADE GUARDRAIL | MONTEREY COUNTY ABOUT 13 MILES NORTH OF BIG SUR FROM 1 MILE SOUTH OF BIXBY CREEK BRIDGE TO 0.3 MILE SOUTH OF ROCKY CREEK BRIDGE | 10/29/2020 | 1 (09/06/2019) | Details CEM-3701 Report |
| 209410 | Project ID: 209410 DEA: 051A8904 EFIS: 0512000036 | 05-MON-1-67.9 | REPAIR SPALLED CONCRETE, EXTRACT CHLORIDE, INSTALL CATHODIC PROTECTION | MONTEREY COUNTY ABOUT 14 MILES SOUTH OF CARMEL AT MALPASO CREEK BRIDGE | 06/01/2016 | 1 (07/01/2014) | Details CEM-3701 Report |
| 7377 | Project ID: 7377 DEA: 051A6904 EFIS: 0512000008 | 05-MON-1-58.3,59.9 | CONSTRUCT VIADUCT | MONTEREY COUNTY ABOUT 15 MILES SOUTH OF CARMEL AT 0.1 MILE SOUTH OF ROCKY CREEK BRIDGE AND AT 1.1 MILE SOUTH OF BIXBY CREEK BRIDGE | 05/19/2014 | 1 (10/01/2012) | Details CEM-3701 Report |
| 212308 | Project ID: 212308 DEA: 051C6604 EFIS: 0512000186 | 05-MON-198-22.4/22.8 | WIDEN SHOULDER, RECONSTRUCT ROADWAY AND RESURFACE PAVEMENT WITH HMA. | MONTEREY COUNTY ABOUT 22 MILES EAST OF SAN LUCAS FROM 0.1 MILE WEST TO 0.3 MILE EAST OF NORTH FORK ROAD | 08/14/2018 | 1 (04/26/2017) | Details CEM-3701 Report |
| 2796 | Project ID: 2796 DEA: 050Q2004 | 05-MON-101-R12.6/R15.5 | Construct inside shoulder and rumble strip | MONTEREY COUNTY ABOUT 6 MILES NORTH OF BRADLEY FROM 2.9 MILES NORTH OF JOLON ROAD UNDERCROSSING TO ALVARADO ROAD OVERCROSSING | 06/14/2011 | 1 (03/01/2010) | Details CEM-3701 Report |
