Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13971-13980 of 17796 results.
Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
---|---|---|---|---|---|---|---|
214131 | Project ID: 214131 DEA: 080N69U4 EFIS: 0812000307 COOP: 081635 | 08-RIV-60-22.1/22.6 | Improving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages. | R-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively. | 2 (04/30/2019) | Details CEM-3701 Report | |
2185 | Project ID: 2185 DEA: 042L0304 | 04-ALA-580-R5.8 | CONSTRUCT CONCRETE BARRIER AND THRIE BEAM BARRIER | R5.8 Alameda County near Livermore | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
210289 | Project ID: 210289 DEA: 080E9504 Permit Numbers: 0814NMC0370 08156DP0455 0815NRT0491 | 08-RIV-15-19.45/19.71 | Enter onto Interstate 15 right-of-way just north of Railroad Canyon Road Interchange in the City of Lake Elsinore to remove existing PCCP and AC shoulder and to construct a new southbound JPCP deceleration lane and HMA shoulder, including minor grading, drainage inlet modification, temporary water | Railroad Canyon Road, Lake Elsinore | 07/31/2018 | 2 (08/04/2015) | Details CEM-3701 Report |
1624 | Project ID: 1624 DEA: 040A8604 EFIS: 0400000173 | 04-SM-101-15.64 | BELMONT BIKEWAY PROJECT: AT-GRADE BIKE PATH, RETAINING WALLS, SOUTH AND NORTH APPROACH RAMP STRUCTURES. | RALSTON AVENUE BIKEWAY OC AND O'NEILL SLOUGH PEDESTRIAN BRIDGE | 04/29/2011 | 2 (09/02/2014) | Details CEM-3701 Report |
7511 | Project ID: 7511 EFIS: 0000001155 Permit Numbers: 0812NMC0482 0813NDP0006 0814ART0189 0814ART0190 | 08-SBD-15-29.5/30.9 | Enter onto Interstate 15 (I-15) right of way at Ranchero Road in the City of Hesperia, San Bernardino County, to construct new I-15/Ranchero Road interchange including approx. 1300 foot auxiliary lane prior to N/B off ramp, and approx. 3200 foot auxiliary lane from S/B loop on ramp, street improvem | Ranchero Road, Hesperia | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report |
6458 | Project ID: 6458 EFIS: 0000001155 Permit Numbers: 1208NMC0193 | 12-ORA-5-10.749/11.069 | A-perform street widening on Junipero Serra to include paving, curb & gutter and storm drain modifications to accommodate relocation of street catch basin. B- construct sidewalk & landscape between the existing â ³ Park & Rideâ ³ facilities and Ju | Rancho Viejo Road, San Juan Capistrano | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
208568 | Project ID: 208568 DEA: 03372804 EFIS: 0300000428 Permit Numbers: 0312NMC0382 | 03-ED-50-15.6/17 | Construct Phase 1A - Interchange Improvement | Ray Lawyer Dr WB on Ramp to US 50 and Fair Lane Road | 12/08/2017 | 2 (03/01/2013) | Details CEM-3701 Report |
3933 | Project ID: 3933 DEA: 071X9104 | 07-LA-1-53.9 | REBUILD SLOPES AND DRAINAGE SYSTEM | REBUILD (2) ROADBED SUPPORT SLOPES ANDDRAINAGE SYSTEMS WASHED OUT BY STORMRUNOFFDIR'S EMERGENCY F.A. CONTRACT | 08/19/2010 | 1 (08/18/2010) | Details CEM-3701 Report |
6116 | Project ID: 6116 DEA: 11272504 | 11-SD-94-3.3 | REBUILD CONCRETE CHANNEL | Rebuild Concrete Channel at Cholas Creek Bridge. | 08/02/2010 | 1 (08/02/2010) | Details CEM-3701 Report |
973 | Project ID: 973 DEA: 031M4404 | 03-COL-20-30.6 | CONCRETE SIDEWALK | RECONSTRUCT PORTIONS OF CONCRETE SIDEWALK IN THE CITY OF COLUSA ALONG ROUTE 20 FROM FREMONT STREET TO BRIDGE STREET | 12/08/2017 | 1 (11/21/2014) | Details CEM-3701 Report |