Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13971-13980 of 17796 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
214131Project ID: 214131
DEA: 080N69U4
EFIS: 0812000307
COOP: 081635
08-RIV-60-22.1/22.6Improving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages.R-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively. 2 (04/30/2019)Details CEM-3701 Report
2185Project ID: 2185
DEA: 042L0304
04-ALA-580-R5.8CONSTRUCT CONCRETE BARRIER AND THRIE BEAM BARRIERR5.8 Alameda County near Livermore04/20/20111 (04/20/2011)Details CEM-3701 Report
210289Project ID: 210289
DEA: 080E9504
Permit Numbers: 0814NMC0370 08156DP0455 0815NRT0491
08-RIV-15-19.45/19.71Enter onto Interstate 15 right-of-way just north of Railroad Canyon Road Interchange in the City of Lake Elsinore to remove existing PCCP and AC shoulder and to construct a new southbound JPCP deceleration lane and HMA shoulder, including minor grading, drainage inlet modification, temporary waterRailroad Canyon Road, Lake Elsinore07/31/20182 (08/04/2015)Details CEM-3701 Report
1624Project ID: 1624
DEA: 040A8604
EFIS: 0400000173
04-SM-101-15.64BELMONT BIKEWAY PROJECT: AT-GRADE BIKE PATH, RETAINING WALLS, SOUTH AND NORTH APPROACH RAMP STRUCTURES.RALSTON AVENUE BIKEWAY OC AND O'NEILL SLOUGH PEDESTRIAN BRIDGE04/29/20112 (09/02/2014)Details CEM-3701 Report
7511Project ID: 7511
EFIS: 0000001155
Permit Numbers: 0812NMC0482 0813NDP0006 0814ART0189 0814ART0190
08-SBD-15-29.5/30.9Enter onto Interstate 15 (I-15) right of way at Ranchero Road in the City of Hesperia, San Bernardino County, to construct new I-15/Ranchero Road interchange including approx. 1300 foot auxiliary lane prior to N/B off ramp, and approx. 3200 foot auxiliary lane from S/B loop on ramp, street improvemRanchero Road, Hesperia07/31/2018NOT VERIFIEDDetails CEM-3701 Report
6458Project ID: 6458
EFIS: 0000001155
Permit Numbers: 1208NMC0193
12-ORA-5-10.749/11.069A-perform street widening on Junipero Serra to include paving, curb & gutter and storm drain modifications to accommodate relocation of street catch basin. B- construct sidewalk & landscape between the existing â ³ Park & Rideâ ³ facilities and JuRancho Viejo Road, San Juan Capistrano09/08/2016NOT VERIFIEDDetails CEM-3701 Report
208568Project ID: 208568
DEA: 03372804
EFIS: 0300000428
Permit Numbers: 0312NMC0382
03-ED-50-15.6/17Construct Phase 1A - Interchange ImprovementRay Lawyer Dr WB on Ramp to US 50 and Fair Lane Road12/08/20172 (03/01/2013)Details CEM-3701 Report
3933Project ID: 3933
DEA: 071X9104
07-LA-1-53.9REBUILD SLOPES AND DRAINAGE SYSTEMREBUILD (2) ROADBED SUPPORT SLOPES ANDDRAINAGE SYSTEMS WASHED OUT BY STORMRUNOFFDIR'S EMERGENCY F.A. CONTRACT08/19/20101 (08/18/2010)Details CEM-3701 Report
6116Project ID: 6116
DEA: 11272504
11-SD-94-3.3REBUILD CONCRETE CHANNELRebuild Concrete Channel at Cholas Creek Bridge.08/02/20101 (08/02/2010)Details CEM-3701 Report
973Project ID: 973
DEA: 031M4404
03-COL-20-30.6CONCRETE SIDEWALKRECONSTRUCT PORTIONS OF CONCRETE SIDEWALK IN THE CITY OF COLUSA ALONG ROUTE 20 FROM FREMONT STREET TO BRIDGE STREET12/08/20171 (11/21/2014)Details CEM-3701 Report