Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13951-13960 of 18983 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213259 | Project ID: 213259 DEA: 060X6404 | 06-TUL,TUL-190-39.9/47.0 | Repair roadway and slope damage due to mudslide | 08/02/2023 | 1 (04/11/2019) | Details CEM-3701 Report | |
| 213709 | Project ID: 213709 DEA: 060Y6304 EFIS: 0619000050 | 06-TUL-190-40.0/44.0, 40.0 / 44.0 | Repair roadway and slope damage due to mudslide | 02/29/2024 | 1 (01/31/2020) | Details CEM-3701 Report | |
| 209125 | Project ID: 209125 DEA: 100Y7604 EFIS: 1014000037 | 10-TUO-120-40.2/56.5 | Repair Roadway Damage | Rte 120 From Ferretti Road to the West Boundary of Yosemite National Park | 07/28/2021 | 1 (01/06/2014) | Details CEM-3701 Report |
| 213543 | Project ID: 213543 DEA: 081K2104 EFIS: 0819000001 | 08-SBD,SBD-38-R12.4/28.3 | Repair roadway damage | 12/02/2019 | NOT VERIFIED | Details CEM-3701 Report | |
| 213056 | Project ID: 213056 DEA: 11430224 | 11-SD-15-R52.1/R52.6 | Repair roadway damage due to wildfire | 1 (11/01/2010) | Details CEM-3701 Report | ||
| 211128 | Project ID: 211128 DEA: 022H3004 | 02-SIS-96-26.7 | Repair roadway damaged by slide material | About 14 miles west of Happy Camp at 1.1 miles East of Beck Ranch Road | 11/30/2016 | 1 (07/14/2016) | Details CEM-3701 Report |
| 20 | Project ID: 20 DEA: 010A8204 EFIS: 0100020398 | 01-HUM-299-20.2/20.5 | Repair Roadway due to Slide | In Humboldt County in Blue Lake from 0.2 mile to 0.5 mile west of Chezem Rd. | 10/30/2020 | 1 (03/10/2011) | Details CEM-3701 Report |
| 1001968 | Project ID: 1001968 DEA: 081T2704 EFIS: 0826000030 | 08-SBD--unknown | REPAIR ROADWAY PAVEMENT AND EMBANKMENT DIR'S ORDER EMERGENCY | 04/03/2026 | 1 (03/10/2026) | Details CEM-3701 Report | |
| 1001987 | Project ID: 1001987 DEA: 043X7404 EFIS: 0425000317 MINOR: 04A7375 | 04-CC-24-5.1-5.4 | Repair roadway settlement and reconstruct HMA dikes and MGS. | On State Route Eastbound 25 in the city of Lafayette, Contra Costa County | 1 (04/10/2026) | Details CEM-3701 Report | |
| 212897 | Project ID: 212897 DEA: 042J5604 EFIS: 0414000529 | 04-MRN-1-0.3 | REPAIR ROADWAY SLIP-OUT | IN MARIN COUNTY NEAR MILL VALLEY ROAD AT 0.1 MILE EAST OF TENNESSEE VALLEY ROAD | 12/17/2019 | 1 (06/04/2019) | Details CEM-3701 Report |
