Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13921-13930 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4918 | Project ID: 4918 DEA: 080G9504 | 08-SBd-138-1.5/2.5 | INSTALL TRAFFIC SIGNAL AND LIGHTING | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 4917 | Project ID: 4917 DEA: 080G7504 | 08-SBd-15-R13.8/R20.1 | BRIDGE REHABILITATION AND REPLACE JOINT SEALS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 4916 | Project ID: 4916 DEA: 080G7404 | 08-SBd-15-3.9/8.9 | BRIDGE DECK REHABILITATION | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 4915 | Project ID: 4915 DEA: 080G7304 | 08-RIV-10-R144.1/R156.6 | COLD PLANE AND PLACE 0.08′ RUBBERIZED HOT MIX ASPHALT (OG) | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 4914 | Project ID: 4914 DEA: 080G7204 | 08-RIV-10-134 | RESURFACE ASPHALT CONCRETE | IN RIVERSIDE COUNTY NEAR BLYTHE FROM 1.6 KM WEST OF WILEY WELL ROAD TO 8.1 KM WEST OF ROUTE 78 | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 4913 | Project ID: 4913 DEA: 080G7004 | 08-RIV-10-R105.0/R134.3 | COLD PLANE AND PLACE RUBBERIZED HOT MIX ASPHALT | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 4912 | Project ID: 4912 DEA: 080G6804 | 08-SBD-395-395 | OVERLAY ROADWAY | IN SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE AT VARIOUS LOCATIONS | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 4911 | Project ID: 4911 DEA: 080G6704 | 08-SBD-58-13 | GRIND PAVEMENT | IN SAN BERNARDINO COUNTY IN AND NEAR BARSTOW FROM 11.7 KM EAST OF JUNCTION ROUTE 395 TO 8.8 KM WEST OF HINKLEY ROAD | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 4910 | Project ID: 4910 DEA: 080G6604 | 08-RIV-215-8.4 | COLD PLANE ASPHALT CONCRETE | IN RIVERSIDE COUNTY FROM ROUTE15 AND 215 SEPARATION TO 0.4 KM NORTH OF ETHANC ROAD OVERCROSSING | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
| 4909 | Project ID: 4909 DEA: 080G6504 | 08-RIV-15-3.2 | OVERLAY ASPHALT CONCRETE | IN RIVERSIDE COUNTY NEAR TEMECULA FROM THE SOUTH JUNCTION OF ROUTE 79 TO JUNCTION ROUTE 215 | 07/28/2010 | 1 (07/28/2010) | Details CEM-3701 Report |
