Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13921-13930 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 8207 | Project ID: 8207 DEA: 031F6204 EFIS: 0300020557 | 03-NEV-49-31.3/R32.6 | RECONSTRUCT EMBANKMENT AND OVERLAY | NEVADA COUNTY NEAR NORTH SAN JUAN FROM 1.3 MILES SOUTH OF THE MIDDLE YUBA RIVER BRIDGE TO THE MIDDLE YUBA RIVER BRIDGE | 10/01/2014 | 1 (07/22/2013) | Details CEM-3701 Report |
| 993121 | Project ID: 993121 DEA: 032H62U4 EFIS: 0319000021 | 03-NEV-20-25.6/39.8 | ROADWAY EXCAVATION, HMA (TYPE A) WITH CLASS 2 AB, RCB CULVERT AND RCP. | NEVADA COUNTY NEAR OMEGA AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF CONSERVATION ROAD (WASHINGTON RIDGE ROAD) TO 1.2 MILES WEST OF ZEIBRIGHT ROAD | 07/15/2025 | 1 (07/26/2021) | Details CEM-3701 Report |
| 215485 | Project ID: 215485 DEA: 031G9704 EFIS: 0320000138 | 03-NEV-174-4.6/5.3 | INSTALL CURED-IN-PLACE PIPELINERS. | NEVADA COUNTY NEAR PEARDALE AT VARIOUS LOCATIONS FROM YOU BET ROAD TO 0.3 MILE EAST OF MEADOW VIEW DRIVE | 11/01/2021 | 1 (02/19/2021) | Details CEM-3701 Report |
| 214518 | Project ID: 214518 DEA: 034F3704 EFIS: 0314000152 | 03-NEV-174-2.7/4.6 | REALIGN ROADWAY CURVES. | NEVADA COUNTY NEAR PEARDALE FROM MAPLE WAY TO YOU BET ROAD | 01/19/2023 | 1 (11/22/2019) | Details CEM-3701 Report |
| 1000092 | Project ID: 1000092 DEA: 032G7904 EFIS: 0322000163 | 03-NEV-80-R9.1 | SPOT BLAST CLEAN AND PAINT BRIDGE. | NEVADA COUNTY NEAR TRUCKEE AT DONNER LAKE UNDERCROSSING | 1 (02/26/2024) | Details CEM-3701 Report | |
| 209449 | Project ID: 209449 DEA: 034M6104 EFIS: 0312000186 | 03-NEV-80-R9.0,28.1 | SUBSTRUCTURE MITIGATION AND BRIDGE DECK POLYESTER OVERLAY. | NEVADA COUNTY NEAR TRUCKEE AT DONNER LAKE UNDERCROSSING AND AT TRUCKEE RIVER BRIDGE | 10/27/2015 | 1 (05/20/2014) | Details CEM-3701 Report |
| 215387 | Project ID: 215387 DEA: 031H0104 EFIS: 0316000046 | 03-NEV-80-28.3/28.7 | INSTALL CABLE NET DRAPERY SYSTEM. | NEVADA COUNTY NEAR TRUCKEE FROM 0.2 MILE EAST OF TRUCKEE RIVER BRIDGE TO 0.8 MILE WEST OF FARAD UNDERCROSSING | 03/02/2022 | 1 (01/18/2021) | Details CEM-3701 Report |
| 1241 | Project ID: 1241 DEA: 033M8304 | 03-NEV-80-13.5/21.2 | BONDED WEARING COURSE OVERLAY | NEVADA COUNTY NEAR TRUCKEE FROM 0.3 MILE EAST OF DONNER PARK OVERCROSSING TO TRUCKEE RIVER BRIDGE NUMBER 17-0012 | 10/19/2012 | 1 (05/02/2011) | Details CEM-3701 Report |
| 8215 | Project ID: 8215 DEA: 033F0304 EFIS: 0312000045 | 03-NEV-80-R12.3/13.3 | PAVE MEDIAN; INSTALL CONCRETE MEDIAN BARRIER & SIGN TRUSS STRUCTURE. | NEVADA COUNTY NEAR TRUCKEE FROM 0.4 MILE WEST OF DONNER PASS ROAD OVERCROSSING TO 0.1 MILE EAST OF DONNER PASS ROAD OVERCROSSING | 10/01/2014 | 1 (07/25/2013) | Details CEM-3701 Report |
| 1266 | Project ID: 1266 DEA: 034C2204 | 03-NEV-80-19.1/19.3 | REPAIR AND REPLACE HEATING SYSTEM,STATIC SCALE, AND PCC PAVMENT | NEVADA COUNTY NEAR TRUCKEE FROM 0.9 MILE WEST OF UNION MILLS UNDERCROSSING TO 1.1 MILES WEST OF UNION MILLS UNDERCROSSING AT DONNER PASS TRUCK INSPECTION FACILITY AT 12800 HIGHWAY 80 | 04/07/2011 | 1 (04/07/2011) | Details CEM-3701 Report |
