Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13891-13900 of 18754 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7412 | Project ID: 7412 DEA: 05315804 EFIS: 0500000495 COOP: 050268 | 05-MON,SBT-101-100.0/101.3,0.0/1.6 | CONSTRUCT INTERCHANGE, RETAINING WALLS, CONC BARRIER, WIDEN SHOULDERS. | MONTEREY AND SAN BENITO COUNTIES NEAR PRUNDALE AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF DUNBARTO 1N ROAD (NORTH) TO CANNON ROAD | 06/16/2016 | 1 (10/29/2012) | Details CEM-3701 Report |
| 215257 | Project ID: 215257 DEA: 11056374 EFIS: 1117000087 | 11-SD-11-0.6/2.7 | CONSTRUCT INTERCHANGE, PLACE JPCP, HMA, AND INSTALL LIGHTING. | SAN DIEGO COUNTY NEAR SAN DIEGO FROM 0.2 MILE WEST OF SANYO AVENUE UNDERCROSSING TO 1.2 MILE EAST OF ENRICO FERMI DRIVE OVERCROSSING | 1 (11/25/2020) | Details CEM-3701 Report | |
| 7529 | Project ID: 7529 DEA: 031A4644 EFIS: 0300020246 | 03-SUT-99,113-R20.0,16.4 | CONSTRUCT INTERCHANGE WITH CIP PS BOX GIRDER BR, IB, AB, HMA, RHMA. | SUTTER COUNTY IN TUDOR AT ROUTE 99/113 SEPARATION | 02/06/2015 | 1 (09/24/2012) | Details CEM-3701 Report |
| 4805 | Project ID: 4805 DEA: 080A4504 EFIS: 0800000017 Permit Numbers: 0810NMC0555 0811NMC1008 | 08-SBD-15-38.3/39.4 | Construct interchange at La Mesa/Nisquali Road and realign frontage roads. | In Victorville, on Route 15 at La Mesa Road/Nisquali Road between Bear Valley Road and Palmdale Road (Route 18). | 07/31/2018 | 1 (12/20/2012) | Details CEM-3701 Report |
| 36 | Project ID: 36 DEA: 01290304 | 01-HUM-36,101-R0.0/0.5,91.7/95.0 | CONSTRUCT INTERCHANGE AND FRONTAGE ROAD | Humboldt county, Hwy 101 Alton Interchange | 03/11/2011 | 1 (12/02/2009) | Details CEM-3701 Report |
| 211847 | Project ID: 211847 DEA: 07224104 EFIS: 0700000357 | 07-LA-60-21.5R/23.0R | Construct Interchange -MAINLINE PAVEMENT REPAIR, PCC SLABSC HM1 (RIGID) PROGRAM | CITY OF INDUSTRY & DIAMOND BAR FROM FAIRWAY DR UC TO OLD BREA CYN RD UC | 04/26/2018 | 2 (04/25/2017) | Details CEM-3701 Report |
| 7492 | Project ID: 7492 DEA: 06325504 EFIS: 0600000367 | 06-KIN-198-R8.9/R10.1 | CONSTRUCT INTERCHANGE | KINGS COUNTY IN AND NEAR LEMOORE FROM 0.5 MILE WEST TO 0.7 MILE EAST OF 19TH AVENUE | 07/30/2018 | 1 (10/08/2012) | Details CEM-3701 Report |
| 2796 | Project ID: 2796 DEA: 050Q2004 | 05-MON-101-R12.6/R15.5 | Construct inside shoulder and rumble strip | MONTEREY COUNTY ABOUT 6 MILES NORTH OF BRADLEY FROM 2.9 MILES NORTH OF JOLON ROAD UNDERCROSSING TO ALVARADO ROAD OVERCROSSING | 06/14/2011 | 1 (03/01/2010) | Details CEM-3701 Report |
| 7777 | Project ID: 7777 DEA: 060G8404 EFIS: 0600020166 COOP: 061474A1 | 06-KER-99-27.0/R28.4 | CONSTRUCT INSIDE LANES, SHOULDERS, AND CONCRETE BARRIER. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 204/99 SEPARATION TO BEARDSLEY CANAL | 12/19/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 993115 | Project ID: 993115 DEA: 07319904 EFIS: 0716000028 | 07-LA-5-39.4/R44.4 | CONSTRUCT INFILTRATION AREA AND VEGETATION CONTROL AND PAVE GORE AREA. | LOS ANGELES COUNTY IN LOS ANGELES FROM ROUTE 5/118 SEPARATION TO BALBOA BOULEVARD OVERCROSSING | 09/24/2024 | 1 (07/12/2021) | Details CEM-3701 Report |
