Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 1381-1390 of 18884 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1612 | Project ID: 1612 DEA: 040A5354 EFIS: 0400000153 COOP: 042323 | 04-SOL-12,80-L1.8/L2.0,13.3/15.7 | CONSTRUCT BR AND RW, RECONSTRUCT WEIGH STATION AND WIDEN RAMPS. | SOLANO COUNTY IN AND NEAR FAIRFIELD ON ROUTE 12 FROM 80/12 EAST JUNCTION TO 0.2 MILE WEST OF CHADBOURNE ROAD UNDERCROSSING AND ON ROUTE 80 AT VARIOUS LOCATIONS FROM 0.2 MILE WEST OF SUISUN VALLEY ROAD OVERCROSSING TO 0.5 MILE WEST OF ABERNATHY ROAD OVERCR | 06/29/2015 | 1 (12/11/2012) | Details CEM-3701 Report |
| 214997 | Project ID: 214997 DEA: 044G8724 EFIS: 0416000153 | 04-SOL-80-14.55 | ROCK SLOPE PROTECTION (RSP), RSP BACKFILL AND STRUCTURE EXCAVATION. | SOLANO COUNTY IN AND NEAR FAIRFIELD AT SUISUN CREEK BRIDGE | 05/31/2023 | 1 (10/19/2020) | Details CEM-3701 Report |
| 994291 | Project ID: 994291 DEA: 044G8734 EFIS: 0421000042 | 04-SOL-80-13.9,14.5 | MAINTAIN EXISTING PLANTED AREAS. | SOLANO COUNTY IN AND NEAR FAIRFIELD AT DAN WILSON CREEK BRIDGE AND AT SUISUN CREEK BRIDGE | 1 (10/14/2022) | Details CEM-3701 Report | |
| 1001221 | Project ID: 1001221 DEA: 040X7604 EFIS: 0424000164 | 04-SOL-113-18.3/21.2 | COLD PLANE AC PAVEMENT, PLACE HMA AND OVERLAY WITH SLURRY SEAL. | SOLANO COUNTY IN AND NEAR DIXON FROM PARKWAY BOULEVARD TO ROUTE 113/80 SEPARATION | 1 (04/28/2025) | Details CEM-3701 Report | |
| 994320 | Project ID: 994320 DEA: 040J6014 EFIS: 0420000359 | 04-SOL-80,505-34.4,R0.2 | MAINTAIN EXISTING PLANTED AREAS. | SOLANO COUNTY IN AND NEAR DIXON AND VACAVILLE ON ROUTE 80 AT MC CUNE CREEK BRIDGE AND ON ROUTE 505 AT HORSE CREEK BRIDGE | 1 (10/14/2022) | Details CEM-3701 Report | |
| 213102 | Project ID: 213102 DEA: 040Q5104 EFIS: 0418000110 | 04-SOL-80-0.0/44.7 | REPLACE PAVEMENT DELINEATION. | SOLANO COUNTY FROM CARQUINEZ BRIDGE TO YOLO COUNTY LINE | 12/19/2018 | 1 (02/13/2018) | Details CEM-3701 Report |
| 2228 | Project ID: 2228 DEA: 043A3004 | 04-SOL-80-38.3/44.7 | ROAD RESURFACING AND APPROACH SLAB REPLACEMENT | SOLANO COUNTY FROM 1.4 MILE WEST OF PEDRICK ROAD OVERCROSSING TO YOLO COUNTY LINE | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 1000539 | Project ID: 1000539 DEA: 044K3004 EFIS: 0417000293 | 04-SOL-80-22.1/R23.0 | CONSTRUCT CONCRETE BARRIER AND INSTALL DRAINAGE SYSTEM. | SOLANO COUNTY FROM 1.2 MILES EAST OF NORTH TEXAS STREET OVERCROSSING IN FAIRFIELD TO 0.1 MILE WEST OF CHERRY GLEN ROAD OVERCROSSING IN VACAVILLE | 1 (08/29/2024) | Details CEM-3701 Report | |
| 7791 | Project ID: 7791 DEA: 044A2504 | 04-SOL-80-0.9/45.0 | INSTALL METAL BEAM GUARD RAILING. | SOLANO COUNTY FROM 0.2 MILE SOUTH OF ROUTE 80/29 SEPARATION TO 1.1 MILE NORTH OF SOUTH DAVIS OVERHEAD | 08/09/2013 | 1 (12/03/2012) | Details CEM-3701 Report |
| 209221 | Project ID: 209221 DEA: 043E5004 EFIS: 0412000373 | 04-SOL-80,113,505-Var | TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS. | SOLANO COUNTY AT VARIOUS LOCATIONS. | 07/17/2015 | 1 (03/04/2014) | Details CEM-3701 Report |
