Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 13841-13850 of 18983 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
210736Project ID: 210736
DEA: 07293404
EFIS: 0712000216
07-LA-5-25.2/25.9CONSTRUCT MEDIAN CONCRETE BARRIER.IN THE CITIES OF LOS ANGELES ANDGLENDALE, ON THE COLARADO FREEWAY EXTENSION, FROM SOUTHBOUND ROUTE 5 ON-RAMP TO WEST COLORADO STREET06/16/20211 (05/23/2016)Details CEM-3701 Report
213386Project ID: 213386
DEA: 101F7304
EFIS: 1016000144
10-SJ-99-5.3/5.7CONSTRUCT MEDIAN CONCRETE BARRIER.SAN JOAQUIN COUNTY IN MANTECA FROM 0.5 MILE TO 0.1 MILE SOUTH OF SOUTH JUNCTION ROUTE 99/120 SEPARATION.11/21/2018NOT VERIFIEDDetails CEM-3701 Report
212902Project ID: 212902
DEA: 060S3104
EFIS: 0614000105
06-TUL-190-R15.1/17.0CONSTRUCT MEDIAN CONCRETE BARRIER AND WIDEN INSIDE SHOULDER.TULARE COUNTY IN PORTERVILLE FROM SOUTH PROSPECT STREET TO SOUTH PLANO STREET06/26/20191 (05/17/2018)Details CEM-3701 Report
210382Project ID: 210382
DEA: 100X5404
EFIS: 1012000303
10-SJ-5-41.7/45.9CONSTRUCT MEDIAN BARRIER.SAN JOAQUIN COUNTY NEAR THORNTON FROM TURNER ROAD UNDERCROSSING TO BEAVER SLOUGH BRIDGE12/13/20161 (09/23/2015)Details CEM-3701 Report
2813Project ID: 2813
DEA: 050Q4404
EFIS: 0500000308
MINOR: 05A1178
05-SCR-1-12.9CONSTRUCT MEDIAN BARRIER IN SANTA CRUZ COUNTY IN CAPITOLA AT CAPITOLA AVENUE OVERCROSSING 03/18/20201 (11/08/2019)Details CEM-3701 Report
6648Project ID: 6648
DEA: 120H5804
12-ORA-91- 13.6/ 18.9CONSTRUCT MEDIAN BARRIER AT THREE LOCATIONS 07/28/20101 (07/28/2010)Details CEM-3701 Report
3329Project ID: 3329
DEA: 060L1804
06-KER-5-5.2/5.9CONSTRUCT MEDIAN BARRIER AND WIDEN INSIDE SHOULDER.KERN COUNTY NEAR FORT TEJON FROM 0.2 MILE NORTH TO 0.9 MILE NORTH OF FORT TEJON OVERCROSSING05/14/20131 (10/03/2011)Details CEM-3701 Report
2630Project ID: 2630
DEA: 050L5504
05-MON-101-73.9CONSTRUCT MEDIAN BARRIERIN MONTEREY COUNTY NEAR GONZALESFROM 2.0 KM NORTH OF GONZALES OVERCROSSING TO 1.4 KM SOUTH OF MAIN STREET OVERCROSSING04/20/20111 (04/20/2011)Details CEM-3701 Report
3058Project ID: 3058
DEA: 060A8604
06-KER-99- 2.7CONSTRUCT MEDIAN BARRIERIN KERN COUNTY NEAR WHEELER RIDGE FROM ROUTE 166 AND 99 SEPARATIONTO BEAR MOUNTAIN BOULEVARDOVERCROSSING04/21/20111 (06/09/2006)Details CEM-3701 Report
3059Project ID: 3059
DEA: 060A8804
06-KER-99-L1.2/4.4CONSTRUCT MEDIAN BARRIER 04/21/20111 (04/11/2007)Details CEM-3701 Report