Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 13821-13830 of 18772 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213442 | Project ID: 213442 DEA: 112E1504 EFIS: 1117000179 | 11-SD-5-38.1/39.3 | (ALTERNATIVE DELIVERY) WETLAND CONSTRUCTION | NEAR STATE HIGHWAY IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS AT VARIOUS LOCATIONS | 09/20/2021 | 1 (08/28/2018) | Details CEM-3701 Report |
| 210707 | Project ID: 210707 DEA: 040K1704 EFIS: 0416000057 | 04-SON-1-45.1 | Reconstruction portion of failed culvert | Near Stewarts Point at 2.7 miles south of Stewarts Point Skaggs Springs Road | 01/03/2017 | NOT VERIFIED | Details CEM-3701 Report |
| 215055 | Project ID: 215055 DEA: 042AC204 EFIS: 0420000114 | 04-MRN-1-8.5, 8.5-9.5 | SOLDIER PILE WALL (REPAIR) | NEAR STINSON BEACH FROM COLD STREAM TO 0.2 MILE SOUTH OF LONE TREE CREEK | 06/20/2022 | 1 (07/01/2020) | Details CEM-3701 Report |
| 213682 | Project ID: 213682 DEA: 11430184 EFIS: 1117000215 | 11-SD-805-8.4/8.8 | Bridge widening, HMA, barrier, drainage, RCP, and landscape work near Sweetwater River Bridge in Chula Vista. Widening of Sweetwater River Bridge in Chula Vista on 805. | Near Sweetwater River Bridge in Chula Vista on 805. | 09/14/2023 | 1 (06/01/2020) | Details CEM-3701 Report |
| 210969 | Project ID: 210969 DEA: 060U9104 | 06-KER-58,5-100/106,NB5.6/6.2,SB 7.2/8, 99.9/107.7, 100.0/106.0 | Clear Mudslides | Near Tehachapi, from 9.3 miles east of Rte 58/202 Jct to 5.8 miles west of Rte 58/14 Jct. | 08/02/2023 | 1 (04/11/2019) | Details CEM-3701 Report |
| 2688 | Project ID: 2688 DEA: 050M9304 EFIS: 0500020148 MINOR: 05A1456 | 05-SLO-101-52.4 | Modify Lighting in San Luis Obispo County | Near Templeton at Main Street | 12/31/2012 | 1 (12/15/2016) | Details CEM-3701 Report |
| 7515 | Project ID: 7515 DEA: 080E5204 EFIS: 0800000088 Permit Numbers: 0811NMC0804 0812NDP5204 | 08-RIV--R32.32/R35.95 | Enter onto Interstate 215 right-of-way at Van Buren Boulevard Interchange to reconstruct the interchange including but not limited to realign freeway ramps, replace overcrossing and overhead bridges, construct retaining walls, drainage facilities, signal | Near the city of Riverside, on Interstate 215 at Van Buren Boulevard | 10/26/2012 | 1 (09/03/2012) | Details CEM-3701 Report |
| 210154 | Project ID: 210154 DEA: 042J5304 EFIS: 0414000526 | 04-MRN-1,001-42.5 | Construct Solider Pile Wall | Near Tomales , at 2.8 miles south of Tomales-Petaluma Toad | 05/26/2016 | 1 (03/09/2015) | Details CEM-3701 Report |
| 209085 | Project ID: 209085 DEA: 081E5404 EFIS: 0814000048 | 08-RIV-18.0,28.3-45 | Replace MBGR and traffic signs. Stabilized slopes | Near Twin Pines from 0.7 mile south of Hurley Flats Road to San Gorgonio Avenue | 11/21/2013 | 1 (10/08/2013) | Details CEM-3701 Report |
| 61 | Project ID: 61 DEA: 01380504 | 01-MEN-222-1.6 | REPLACE BRIDGE (SCOUR) | Near Ukiah at Russian River Bridge | 01/04/2012 | 1 (04/28/2011) | Details CEM-3701 Report |
